Diamond DA20-C1 Maintenance Manual page 66

Hide thumbs Also See for DA20-C1:
Table of Contents

Advertisement

Maintenance Practices
14.
Apply the two cross coats to achieve the
required thickness.
15.
Let the transparent top coat dry, in a dust free
area as follows:
For product 9008B0900D:
For product CA8720M0900C:
16.
Remove and discard the cover(s) and masking
tape from the cowling.
Remove any dust that has collected with a fully
opened tack cloth.
17.
Visually inspect the completed high
temperature paint repair(s).
Make sure that there are no defects, such as
bubbles, pinholes, craters, chips, scratches or
abrasions.
18.
Install the cowling.
Page 204
30 Oct 09
Detail Steps/Work Items
53-10-00
Key Items/References
Film thickness:
For the first coat: 25 microns
For the second coat: 35 microns.
Total thickness: 60 microns
(0.002 in or 2.3 mil)
The following drying times refer to a normal
climate of 23 ºC and 50% humidity:
- Dry to Tape: 10 to 14 hours
- Full cure: 7days
- Dry to Tape: 3 to 4 hours
- Full cure: 7days
Refer to AMM Chapter 71-10.
DA20-C1 AMM
DA201-C1
Rev 16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents