DA20-C1 AMM
7.
Attach the cabin heat valve flexible pipe to the
heat exchanger.
- Install the worm drive clamp to the heat
exchanger
- Tighten the worm drive clamp.
8.
Do an engine ground run.
- Do an exhaust system leak check.
- Do an EGT system indication check.
9.
Install the cowlings.
DA201-C1
Rev 16
Detail Steps/Work Items
78-00-00
Key Items/References
Refer to DA20-C1 Airplane Flight Manual.
Refer to Chapter 71-10.
Maintenance Practices
Page 203
30 Oct 09