Yamaha FZS6W Service Manual page 71

Hide thumbs Also See for FZS6W:
Table of Contents

Advertisement

1. Left handlebar switch lead
2. Main switch lead
3. Clutch cable
4. Throttle cables
5. Right handlebar switch lead
A. Clamp the right and left handlebar switch
leads and handlebars. Point the tip of the
clamp downward in front of the handlebar.
B. 70–90 mm (2.76–3.54 in)
C. Clamp the horn lead and main switch lead
to the inner tube. Point the binding section
to the outside of the vehicle body and cut
the tip down to the length of 1 to 5 mm
(0.04 to 0.20 in).
D. Route the horn lead by the headmost side.
E. 5–25 mm (0.20–0.98 in)
F. Clamp the horn lead to the inner tube.
Point the binding section to the outside of
the vehicle body and cut the tip down to the
length of 1 to 5 mm (0.04 to 0.20 in).
G. Pass the throttle cables, wire harness lead,
clutch cable, main switch lead and left han-
dlebar switch lead in order through the
frame hole from the lower side of the vehi-
cle.
H. Point the lead, which comes from the ter-
minal, to the front side of the vehicle body.
There should be no slack of leads between
the band and terminals.
I. Clamp the brake hose to the inner tube.
Point the binding section to the outside of
the vehicle body and cut the tip down to the
length of 1 to 5 mm (0.04 to 0.20 in).
J. Pass the throttle cables through the wire
guide. Route the right handlebar switch
lead by the outside of the wire guide.
2-48
CABLE ROUTING

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fzs8wc

Table of Contents