11.0 Fitting the Outer Case - Page 26

11.1 Fitting The Outer Case

1. Position the outercase on the chassis, ensuring that the
four slots in the side flanges align with the hooks on the
chassis (Fig. 36).
2. Insert the two fixing screws into the sides of the chassis
(Fig. 37).
3. Close the door against the retaining magnets (Fig. 37).
4. Carefully read and complete all sections of the
Benchmark" Installation, Commissioning and Service Record
Log Book that are relevant to the appliance and installation.
The details of the Log Book will be required in the event of
any warranty work. The Log Book must be handed to the
user for safe keeping and each subsequent regular service
visit recorded.
5. Instruct the user in the operation of the boiler controls.
Hand over the Users Operating, Installation and Servicing
Instructions and the Log Book, giving advice on the
necessity of regular servicing.
5. Advise the user that a plume of vapour from the flue
terminal is normal, and that there is no need for concern.
IMPORTANT: This boiler is fitted with an aluminium
alloy heat exchanger.
It is important that the system is thoroughly flushed in
accordance with BS 7593 and that one of the following
inhibitors is used:
BETZ DEARBORN SENTINEL X100
FERNOX COPAL
Refer to inhibitor manufacturer's instructions for correct
use. Failure to comply with this requirement will
invalidate the appliance warranty.
It is also important to check the inhibitor concentration
after installation, system modification and at every
service.
Date Boiler Installed_______/_____/_______
Inhibitor Used
____________________
6. This label is located on the electrical box front cover on
the boiler. Detail of system treatment should be added for
future reference.