Baxi Barcelona System Installation And Servicing Instructions page 21

Wall mounted powered flue condensing boiler gas fired central heating unit
Hide thumbs Also See for Barcelona System:
Table of Contents

Advertisement

8.0
Installation - Page 21
8.6 Fitting the Flue (Cont)
6. Ensure the inner flue support bracket is positioned in the
flue (Fig. 28).
7. Engage the flue into the flue elbow using soap solution to
ease the engagement ensuring the flue is assembled as
shown (Fig. 29).
8. Place the gasket over the flue exit on the boiler.
9. Slide the flue assembly through the hole in the wall.
10. Engage the elbow on to the flue connection on top of the
boiler. Secure with the four screws supplied in the kit.
11. Make good between the wall and air duct outside the
o
building ensuring the 3
drop between the terminal and
elbow.
12. The flue trim should be fitted once the installation is
complete and the flue secure. Apply a suitable mastic to the
inside of the trim and press against the wall finish, making
sure the brickwork is dust free and dry (Fig. 30). If necessary
fit a terminal guard (see section 7.11).
VERTICAL FLUEING
1. Only a flue approved with the Baxi Barcelona System
Boiler can be used.
2. For information on vertical flues consult the Baxi Gas
Central Heating Boilers Installer Guide or Notes for
Guidance supplied with the vertical flue pack.

Advertisement

Table of Contents
loading

Table of Contents