8.0 Installation - Page 18
8.3 Preparing The Boiler
1. Remove the outer carton.
2. Hinge the lower door panel open and remove the outer
case fixing screws (Fig. 22). Close the door against its
retaining magnets.
3. Slide the outercase upwards to disengage the hooks on
the backplate and remove (Fig. 23).
4. Remove the sealing plugs from the copper bends.
5. Stand the boiler on its base by using the rear lower edge
as a pivot.
NOTE: A small amount of water may drain from the
boiler in the upright position.
Baxi Limited declare that no substances harmful to
health are contained in the appliance or used during
construction of the appliance.