Potterton Performa 24 Installation And Servicing Instructions

Potterton performa 24 gas fired wall mounted combination boiler

Advertisement

Performa 24
Gas Fired Wall Mounted Combination Boiler
Installation and Servicing Instructions
Please leave these instructions with the user

Advertisement

Table of Contents
loading

Summary of Contents for Potterton Performa 24

  • Page 1 Performa 24 Gas Fired Wall Mounted Combination Boiler Installation and Servicing Instructions Please leave these instructions with the user...
  • Page 2 Do not leave any parts of the packaging (plastic bags, polystyrene, etc.) within children’s reach as they are a potential source of danger. POTTERTON POTTERTON attests that these models of boiler bear the CE mark in compliance with the basic requirements as laid down in the following Directives:...
  • Page 3: Table Of Contents

    Contents Instructions pertaining to the user Instructions prior to installation Instructions prior to commissioning Commissioning of the boiler Room temperature adjustment DHW temperature adjustment Filling the boiler Turning off the boiler Prolonged standstill of the system. Frost protection (central heating system) Gas change Safety Device Indicators-Activation Servicing instructions...
  • Page 4: Instructions Prior To Installation

    Instructions pertaining to the user Instructions prior to installation This boiler is designed to heat water at a lower than boiling temperature at atmospheric pressure. The boiler must be connected to a central heating system and to a domestic hot water supply system in compliance with its performances and output power.
  • Page 5: Room Temperature Adjustment

    Figure 1 0209_3024 Warning: During initial lighting, until the air contained in the gas pipes is not released, the burner may fail to light immediately and that may cause a ‘blockage’ of the boiler. In this case we recommend you repeat the ignition procedure until gas is delivered to the burner, setting selector (1) to ( ) for at least 1 second (see also figure 4).
  • Page 6: Filling The Boiler

    Filling the boiler Important: Regularly check that the pressure displayed by the pressure gauge (7) is 0.5 to 1 bar, with boiler not operating. In case of overpressure, open the boiler drain valve. In case the pressure is lower open the boiler filling tap (figure 3). We recommend you open the tap very slowly in order to let off the air.
  • Page 7: Safety Device Indicators-Activation

    Safety device Indicators- activation Summer-Winter-Reset selector Flame indicator Block indicator Voltage presence indicator 0209_3022 Figure 4 Indicator LED 2 LED 3 Trouble Reset Gas block Set selector 1 to position R for at least 1 second. No draught Fast flashing Call your Authorised Service Centre No water in the heating circuit Slow flashing...
  • Page 8: Instructions Pertaining To The Installer

    Instructions pertaining to the installer General information Warning: When the selector switch (1) is set on Wintertime operation ( ) it may be necessary to wait some minutes at each intervention of the central heating tempera- ture adjusting control (5). To relight the main burner immediately place the selector switch (1) on (0) and then again on ( ).
  • Page 9 To ensure correct operation of the appliance and avoid invalidating the guarantee, observe the following precautions 1. Hot water circuit: if the water hardness is greater than 20 °F (1 °F = 10 mg calcium carbonate per litre of water) install a polyphosphate or comparable treatment system responding to current regulations.
  • Page 10: The Template To Fix The Boiler On The Wall

    The template to fix the boiler on the wall Decide upon the boiler location, then tape the template on the wall. Connect the pipework to the gas and water inlets prearranged on the template lower bar. We suggest you fit two G3/4 stop cocks (available on demand) on the central heating system flow and return pipework;...
  • Page 11: Installation Of Flue And Air Ducts

    Installation of flue and air ducts We guarantee ease and flexibility of installation for a gas-fired forced draft boiler thanks to the fittings and fixtures supplied (described below). The boiler is especially designed for connection to an exhaust flue / air ducting, with either coaxial, vertical or horizontal terminal.
  • Page 12 Horizontal flue terminal installation options L max = 5 m L max = 5 m L max = 4 m L max = 4 m LAS flue duct installation options L max = 5 m 0010171500...
  • Page 13 Vertical flue terminal installation options This type of installation can be carried out both on a flat or pitched roof by fitting a terminal, an appropriate weathering tile and sleeve, (supplementary fittings supplied on demand). L max = 4 m L max = 4 m L max = 2 m L max = 3 m...
  • Page 14 A 90° bend reduces the total duct length by 0.5 metre. A 45° bend reduces the total duct length by 0.25 metre. Separated horizontal flue terminals installation options IMPORTANT: Ensure a minimum downward slope of 1 cm toward the outside per each metre of duct length In the event of installation of the condensate collection kit, the angle of the drain duct must be directed towards the boiler.
  • Page 15 Separated vertical flue terminals installation options L max = 15 m L max = 14 m Important: if fitting a single exhaust flue duct, ensure it is adequately insulated (e.g.: with glass wool) wherever the duct passes through building walls. For detailed instructions concerning the installation of fittings refer to the technical data accompanying the fittings.
  • Page 16: Connecting The Mains Supply

    Connecting the mains supply Electrical safety of the appliance is only guaranteed by correct grounding, in compliance with the applicable laws and regulations. Connect the boiler to a 230V monophase + ground power supply by means of the three-pin cable supplied with it and make sure you connect polarities correctly.
  • Page 17: Gas Change

    Gas change modalities A Qualified Service Engineer may adapt this boiler to operate with natural gas (G. 20) or with liquid gas (G. 30, G. 31). The procedure for calibrating the pressure regulator may vary according to the type of gas valve fitted (HONEYWELL or SIT; see figure 10). Carry out the following operations in the given sequence: A) substitute the main burner injectors;...
  • Page 18 C1) Adjustment to rated output • open the gas tap and rotate knob (1) to set the boiler to the Winter setting ( • open a hot water tap to reach a minimum 10 l/minute flow rate or ensure that maximum heating requirements are set; •...
  • Page 19 001121_1300...
  • Page 20: Control And Operation Devices

    Control and operation devices The boiler has been designed in full compliance with European reference standards and in particular is equipped with the following: • Central heating temperature adjustment potentiometer This potentiometer sets the central heating flow max. temperature. Its temperature range goes from 30 °C min. to 85 °C max. To increase the temperature turn knob (5) clockwise and anticlockwise to decrease it.
  • Page 21 • Hydraulic differential pressure sensor This pressure sensor, fitted on the hydraulic assembly, allows the main burner to light provided the pump head is as required and protects the flue-water exchanger from possible lacks of water or blockings of the pump (LED 3 flashes slowly). •...
  • Page 22: Positioning Of The Ignition

    Positioning of the ignition and flame sensing electrode Figure 12 Electronic board calibration When the jumper or the switch is in the (fig. 13a) position: operation of system with NATURAL gas T-off 3-minute heating stand-by time Figure 13a When the jumper or the switch is in the (fig. 13b) position: operation of system with LPG T-off 10-seconds heating stand-by time...
  • Page 23: Output / Pump Head Performances

    Output / pump head performances This is a high static head pump fit for installation on any type of single or double-pipe heating systems. The air vent valve incorporated in the pump allows quick venting of the heating system. LUNA 240 i - 240 Fi Graph 1 OUTPUT l/h How to purge the DHW system...
  • Page 24: How To Disassemble The Dhw Heat Exchanger

    How to disassemble the DHW heat exchanger The stainless steel plate-type DHW heat exchanger is easily disassembled with a screwdriver by operating as described below: • drain, if possible, only the boiler system, through the drain tap; • drain the DHW system from water; •...
  • Page 25: Boiler Schematic

    Boiler schematic PERFORMA 24 heating domestic water domestic water heating delivery outlet inlet return Figure 15 Key: 7 pressure gauge 8 gas service cock 9 cold water inlet on/off valve and filter 10 diverter valve assembly 11 DHW flow priority assembly...
  • Page 26: Illustrated Wiring Diagram

    Illustrated wiring diagram PERFORMA 24...
  • Page 27: Technical Data

    Technical data PERFORMA 24...
  • Page 28: Declaration Of Conformity

    DECLARATION OF CONFORMITY POTTERTON declares that this wall hung gas boiler is made in compliance to the following European Standards: EN 435 EN 483 EN 625 EN 60 335-1 EN 50165 EN 60529 EN 61000 EN 55014 POTTERTON also declares that this appliance is tested: •...
  • Page 32 Potterton, Baxi UK Limited, Brownedge Road, Bamber Bridge, Preston, Lancashire. PR5 6SN After Sales Service 08706 096 096 Technical Enquiries 08706 049 049 www.baxi.com Ediz. 1 - 03/04 923.345.1...

Table of Contents