Instructions Prior To Installation; Instructions Prior To Commissioning; Commissioning Of The Boiler - Potterton Performa 24 Installation And Servicing Instructions

Potterton performa 24 gas fired wall mounted combination boiler
Table of Contents

Advertisement

(
)
(
)
Instructions pertaining to the user

Instructions prior to installation

This boiler is designed to heat water at a lower than boiling temperature
at atmospheric pressure. The boiler must be connected to a central heating
system and to a domestic hot water supply system in compliance with
its performances and output power.
Have the boiler installed by a Qualified Service Engineer and ensure the
following operations are accomplished:
a) careful checking that the boiler is fit for operation with the type of
gas available. For more details see the notice on the packaging and
the label on the appliance itself.
b) that the terminal is not obstructed and that no other appliance exhaust
gases are expelled through the same flue duct, unless the flue is
especially designed to collect the exhaust gas coming from more than
one appliance, in conformity with the laws and regulations in force.
c) careful checking that, in case the flue has been connected to pre-
existing flue ducts, thorough cleaning has been carried out in that
residual combustion products may come off during operation of the
boiler and obstruct the flue duct thus engendering dangerous situations.
Instructions prior to
commissioning
Initial lighting of the boiler must be carried out by a licensed technician.
Ensure the following operations are carried out:
a) compliance of boiler parameters with (electricity, water, gas) supply
systems settings.
b) compliance of installation with the laws and regulations in force.
c) appropriate connection to the power supply and grounding of the
appliance.
Failure to observe the above will render the guarantee null and void.
Prior to commissioning remove the protective plastic coating from the
unit. Do not use any tools or abrasive detergents as you may spoil the
painted surfaces.

Commissioning of the boiler

To correctly light the burner proceed as follows:
1) provide power supply to the boiler;
2) open the gas cock;
3) turn the selector switch (1) to set the boiler on summertime (
wintertime (
(
)
4) turn the central heating (5) and domestic hot water (6) adjusting
controls in order to light the main burner.
To increase temperature values turn the control clockwise and
anticlockwise to decrease it.
When on summertime operation (
will start running only when there is a call for hot water.
4
) operation;
) the main burner and the pump
) or

Advertisement

Table of Contents