ASSEMBLY INSTRUCTIONS
STEP 5
Attach the CENTER BEAM(18) to the MAIN FRAME(1) with BUTTON HEAD BOLTS(M8x1.25x25mm)
(42). Attach the STOPPERS(20) to the CENTER BEAM(18) with HEX HEAD BOLTS(M8x1.25x120mm)
(47) and NUTS(M8x1.25)(35).
STEP 6
Run the SENSOR WIRE(27) through the square hole on the METER HOUSING(23), then attach the
METER HOUSING(23) to the CENTER BEAM(18) with ROUND HEAD SCREWS(M5x15mm)(39). Install
two AAA batteries into the METER(22), the batteries are not included. See page 11 for detailed battery
installation instructions. Plug the SENSOR WIRE(27) to the METER(22). Press the METER(22) into the
METER HOUSING(23).
9