Download Print this page
Leister Hot-Jet S Operating Instructions

Leister Hot-Jet S Operating Instructions

Hot air welding tool
Hide thumbs Also See for Hot-Jet S:

Advertisement

Quick Links

OPERATING INSTRUCTIONS

GB
LEISTER Hot-Jet S
Hot Air Welding Tool
Please read operating instructions carefully
before use and keep for further reference.
APPLICATION
• Soldering and de-soldering of SMD thru-hole components.
• Welding of thermoplastic materials and also single-ply flexible plastics and
modified bitumen in the form of boards, tubes, profiles, lining membranes,
coated materials, films, foams, tiles, and sheets. The following procedures
are possible: overlap welding, welding with rod, with tape and fusion
welding by heat.
• Shrinking of heat-shrink sleeves, films, tapes, solder sleeves and moulded
parts.
• Activating/dissolving of solvent free adhesives and fusion adhesives.
• Drying of water-damp surfaces.
LEISTER Process Technologies, Riedstrasse, CH-6060 Sarnen / Switzerland
Tel. + 41- 41 662 74 74 Fax + 41- 41 662 74 16
www.leister.com
®
sales@leister.com
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Hot-Jet S and is the answer not in the manual?

Questions and answers

Summary of Contents for Leister Hot-Jet S

  • Page 1: Operating Instructions

    • Shrinking of heat-shrink sleeves, films, tapes, solder sleeves and moulded parts. • Activating/dissolving of solvent free adhesives and fusion adhesives. • Drying of water-damp surfaces. LEISTER Process Technologies, Riedstrasse, CH-6060 Sarnen / Switzerland www.leister.com sales@leister.com Tel. + 41- 41 662 74 74 Fax + 41- 41 662 74 16...
  • Page 2 WARNING Danger to life when opening the tool, as live compo- nents and connections ar exposed. Unplug the tool before opening it. Incorrect use of hot air blowers can cause fire and explosion hazard, especially near combustible materials and explosive gases. Do not touch the element housing and nozzle when they are hot as they can cause burns.
  • Page 3 • If required, earth the tool via the ESD-lead connection. • Switch on (2) and allow to warm up for about 5 min. Operation • The Leister Company, as well as the Service Centres, offer free training courses in all areas of application (see page 1). Change of nozzles •...
  • Page 4 • Guarantee and liability are in accordance with the guarantee certificate as well as with the currently valid general business and sales conditions. • LEISTER Process Technologies rejects any guarantee claims for tools which are not in their original condition. The tools must never be altered or changed.