Health And Safety Precautions - Harrie Leenders DORAN Instructions For Installation Manual

Table of Contents

Advertisement

Harrie Leenders Doran ­ Instructions for Installation, Use and Maintenance 
READ THE INSTRUCTION BOOKLET AND THESE SUPPLEMENTARY 
INSTRUCTIONS CAREFULLY BEFORE INSTALLATION 
These instructions together with those in the instruction booklet cover the basic principles 
to ensure the satisfactory installation of the stove, although detail may need slight 
modification to suit particular local site conditions. 
In all cases the installation must comply with current Building Regulations, Local Authority 
Byelaws and other specifications or regulations as they affect the installation of the stove. 
It should be noted that the Building Regulations requirements may be met by adopting the 
relevant recommendations given in British Standards BS 8303, BS EN 15287­1:2007 as an 
alternative means to achieve an equivalent level of performance to that obtained following 
the guidance given in Approved Document J. 
Please note that it is a legal requirement under England and Wales Building Regulations 
that the installation of the stove is either carried out under Local Authority Building 
Control approval or is installed by a Competent Person registered with a Government 
approved Competent Persons Scheme. HETAS Ltd operate such a Scheme and a listing of 
their Registered Competent Persons can be found on their website at www.hetas.co.uk. 
CO Alarms:­ 
Building regulations require that when ever a new or replacement fixed solid fuel or wood/ 
biomass appliance is installed in a dwelling a carbon monoxide alarm must be fitted in the 
same room as the appliance. Further guidance on the installation of the carbon monoxide 
alarm is available in BS EN 50292:2002 and from the alarm manufacturer's instructions. 
Provision of an alarm must not be considered a substitute for either installing the 
appliance correctly or ensuring regular servicing and maintenance of the appliance and 
chimney system. 
HEALTH AND SAFETY PRECAUTIONS 
Special care must be taken when installing the stove such that the requirements of the Health and Safety at 
Work Act are met. 
Handling 
Adequate facilities must be available for loading, unloading and site handling. 
Fire Cement 
Some types of fire cement are caustic and should not be allowed to come into contact with the skin.  In 
case of contact wash immediately with plenty of water. 
Asbestos 
This stove contains no asbestos. If there is a possibility of disturbing any asbestos in the course of installa­ 
tion then please seek specialist guidance and use appropriate protective equipment. 
Metal Parts 
When installing or servicing this stove care should be taken to avoid the possibility of personal injury. 
STOVE PERFORMANCE 
Please refer to the table in the main instruction manual for details of the stoves' performances

Advertisement

Table of Contents
loading

Table of Contents