Aleko AS 450 User Manual
Aleko AS 450 User Manual

Aleko AS 450 User Manual

Swing gate opener

Advertisement

www.WholesaleGateOpener.com
REV 13c

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AS 450 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Aleko AS 450

  • Page 1 www.WholesaleGateOpener.com REV 13c...
  • Page 2: Table Of Contents

    Table of Contents Safety Installation Information ………………………………………..…………………………………..2-3 Dual Gate Opener Parts List …………………………………………...…………………………..….….….4 Single Gate Opener Parts List …………………………..…………..…………………………...……….….5 Optional Accessories Parts List………...………………………….…………...…………………..…….…….6 Technical Specifications & Features ………………………………..…………………...……….…………..7 Installation Overview ………………………………………………….…………………...……………….…8-9 Preparation for Installation…………………………………………………..………………………..……..…10 Determining the Position of Mounting Hardware……………………….…………………..……..……..10-13 Installing the Mounting Hardware……………..………………………………………..…….……………13-14 Installing the Opener………...………………………………………………………….……...……….…...…14 Mounting the Control Box …………………………………………………………….….……………..…...
  • Page 3: Safety Installation Information

    Safety Installation Information 1. READ and FOLLOW all instruction. 2. The gate opener is intended for use with Class I vehicular swing gates. Class I denotes a vehicular gate opener (or system) dwellings, or a garage or parking area associated therewith. Install the gate opener only when the opener is appropriate for the construction and the usage class of the gate.
  • Page 4 11. Controls intended to be used to reset an operator after 2 sequential activations of the entrapment protection device or devices must be located in the line of sight of the gate, or easily accessible controls shall have a security feature to prevent unauthorized use. Never allow anyone to hang on or ride the gate during the entire travel of the gate.
  • Page 5: Dual Gate Opener Parts List

    Dual Gate Opener Parts List Opener and Mounting Hardware REV 13a...
  • Page 6: Single Gate Opener Parts List

    Single Gate Opener Parts List Opener and Mounting Hardware REV 13c...
  • Page 7: Optional Accessories Parts List

    Optional Accessories Parts List Tools Needed: ·Power Drill ·Tape Measure ·Open End Wrenches — 14# &17# or Adjustable Wrenches ·Wire Strippers ·C-Clamps — small, medium, and large ·Level ·Hacksaw or Heavy Duty Bolt Cutters ·Phillips Screwdriver ·An extra person will be helpful REV 13b...
  • Page 8: Technical Specifications & Features

    Technical Specifications & Features Specifications AS 450/900 AS 650/1300 GateGuard 850/1700 GateGuard 450/900 GateGuard 650/1300 Input: 120V/60Hz Motor voltage: 24VDC Power: 50W each actuator 80W each actuator 100W each actuator Current: Actuator speed: 16mm/s Max. actuator travel: 385mm 480mm Max. Weight of the gate:...
  • Page 10 Dual Gate Overview Pull-to-Open Gates Important: The second gate opener cable should be put into the PVC conduit (not provided) which is buried underground .This protects the cable from lawn mowers and string trimmers. REV 13c...
  • Page 11: Preparation For Installation

    Preparation for Installation The proper position of the post brackets is a decisive factor to the efficiency and leverage of the gate opener. The distance (usually it is 2.5cm /1 inch or more) between the gate opener and the gate is also determined by the proper position of the post brackets.
  • Page 12 NOTE: Pay attention to the distance A when installing the opener. It MUST be longer than or at least equal to 8cm (3-1/4”). Otherwise, the opener force cannot be effective complete. The opener force is not notably related with the power of the opener. Step 1 Place the post pivot bracket between the two post brackets.
  • Page 13 Step 2 Attach the gate bracket and post bracket assembly to the opener by inserting a clevis pin. Secure the clevis pins using the hairpin clips. Step 3 With the gate in its desired open position (from 0° to 100° from the gate closed position) and with the opener in its retracted position, place the opener with the gate bracket and post bracket assembly on the gate post and the gate.
  • Page 14: Installing The Mounting Hardware

    Step 4 Determine the optimum position of the pivot bracket on the post bracket assembly by ensuring a minimum 2.5cm (1 inch) distance exists between the gate and the gate opener in both the gate-open and gate-closed positions. To ensure the minimum 2.5cm (1 inch) distance maintained in the gate-closed position, remove the clevis pin from the gate bracket while holding the gate opener, and then close the gate.
  • Page 15: Installing The Opener

    Step 6 Using a drill and a bit of ¢10.5, drill holes through the post and the gate at the sign bolt hole point. Step 7 Attach the post bracket assemblies to the gate posts by inserting four M10 x 200 bolts through each post bracket assembly and the drilled holes in the gate post.
  • Page 16: Mounting The Control Box

    Mounting the Control Box Step 1 To install the control box use the deck screws (not provided). Ensure the control box is installed in a secure surface and at least 100 cm (40 inches) above the ground to protect it from rain, snow, etc.
  • Page 17 NOTE: Only motor cables (1.5m length) are provided. Other cables are subject to site installation requirement and not provided. CAUTION: Make sure the cable outlet hole in the Control Box is always down during installation so as to drain off the water. REV 13c...
  • Page 18: Connecting Of The Control Board

    Connecting of the control board REV 13c...
  • Page 19 Actuator 1 Insert the stripped cable wires into the appropriate terminals on the opener terminals block. The red wire should be inserted into the “MOTOR1+” terminal, the black wire into “MOTOR1-“, the blue wire into ULT1, the green wire into COM, and the yellow wire into DLT1 terminal. Actuator 2 Similar as the connection of Actuator 1, insert the stripped cable wires into the appropriate terminals on the opener terminals block.
  • Page 20: How To Learn Or Erase The Remote

    External Receiver (optional) The BROWN wire of the external receiver should be connected into the “19” terminal. The BLACK wire of the external receiver should be connected into the “20” terminal. The RED wire of the external receiver should be connected into the “9” terminal. Wired Keypad (24VDC) (optional) The RED wire of the wired keypad should be connected into the “9”...
  • Page 21: Setting Of The Control Board

    Setting of the Control Board 1. Check again for completed and correct assembly of your swing gate opener and gate. Plug the Power Grounded Cord into the nearest AC outlet. The Digital Display on the Control Board will flash with “- -”. The unit is in standby.
  • Page 22 (Factory set is 3 seconds) Press the “FUNC” button to store the data when the close interval is set. The Digital Display will indicate “P5”. Now Close Interval Set is finished. 6. Adjust the Obstruction Sensitivity/Stall Force When the Digital Display indicates “P5”, the gate opener is on the Stall Force Adjustment. Without a properly installed safety reversal system, person (particularly small children) could be SERIOUSLY INJURED or KILLED by a closing gate.
  • Page 23 7-b. Adjust the MRT of MOTOR2 When the Digital Display indicates “P8”, you can adjust the MRT of MOTOR2. Please perform the same procedure as adjusting MOTOR1 (7-a). Press the “FUNC” button to store the data when you finish setting. The Digital Display will indicate “P9”. Now MOTOR2 adjustment is finished.
  • Page 24: Indicate Illustration On Digital Display When Gate Opener Is Running

    E.g. When the Soft Start Period (STP) is set at 3 sec, and the GRP is 23 sec, how can we get 4 sec of Soft Stop Period (SPP) to meet the requirement? The answer is clear, i.e. we may set the Fast Running Period (FRP) at 16 sec (23 –...
  • Page 25: How To Operate

    How to Operate The user may operate the opener once all adjustment setting is finished. With the gate in its closed position, press and release the remote control, the gate will move to the programmed opening position and stop. With the gate in its opened position, press and release the remote control, the gate will move to the programmed closing position and stop.
  • Page 26 Step 2 Attach the gate bracket and post bracket assembly to the opener by inserting a clevis pin. Secure the clevis pins using the hairpin clips. Step 3 With the gate in closed position and with the opener in their retracted position, place the opener with the gate bracket and post bracket assembly on to the gate post and the gate.
  • Page 27: Maintenance

    Maintenance Warning: Disconnect power before servicing. 1. Using a clean, dry cloth, wipe the gate opener shaft, and then apply a silicone spray to reduce its friction. In cold climates where temperatures reach 1°C (30°F) or less, spray silicone on the actuator every 4~6 weeks to prevent freeze up.
  • Page 28 • Check that wires to the limit switch are not shorted. • Ensure that the motor cable is away from sources of electrical interference, such as electric fences, power lines etc. 6. Gate opens, closes or stops on its own •Ensure that the key for manual release is in the lock position.
  • Page 29: Quick-Setting Guide

    Quick-Setting Guide...
  • Page 34 7106 S 220th St, Kent WA 98032 USA sales@WholesaleGateOpener.com ©2013-2015 ALEKO All Rights Reserved...

This manual is also suitable for:

As 1300As 900Gateguard 650Gateguard 850Gateguard 1700

Table of Contents

Save PDF