Wolf MGK-130 Technical Manual And Installation Instructions page 11

Gas condensing boilers
Table of Contents

Advertisement

Transportation into the installation room
To ease the transportation into the boiler room, lifting
slings are supplied with the boiler.
Never use sack trucks.
NB
Levelling the boiler with the adjustable feet
At the factory the boiler is equipped with four adjustable
feet.
• Level the boiler with the adjustable feet, spanner size
13).
Dimensions
Fig.: Dimensions
(Total height incl. connector
MGK-130 ... 250 = 1460 mm
MGK-300 = 1510 mm)
3062880_0910
Installation information / Dimensions
Fig.: Lifting eyes for lifting slings
Fig.: Feet
Fig.: Connection dimensions
Lifting eyes for lifting slings
MGK-130
MGK-170/210/250/300
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mgk-170Mgk-250Mgk-300Mgk-210

Table of Contents