5. Receiver shall be connected to "Room Thermostat", refer to "Field Supply Accessories" table for details. Receiver's cable
must be (4 or 3 × min 0.5 mm
refer to Diagram 4.2).
6. Tank OLP's cable must be (2 × min 0.5 mm
* note: if such connection deemed NO necessary for tank OLP, please connect jumper between terminal no.13 and 14.
7. Tank Sensor shall be resistance type, please refer to Graph 4.1 for the characteristic and details of sensor. Its cable shall be
2
(2 × min 0.3 mm
), double insulation layer (with insulation strength of min 30V) of PVC-sheathed or polychloroprene sheathed
cable.
8. External Controller shall be connected to 1-pole switch with min 3.0mm contact gap. (connection refer to Diagram 4.3). Its
cable must be (2 × min 0.5 mm
* note: - When making such connection, kindly remove the jumper between terminal no.17 and 18.
- Switch used shall be CE compliance component.
- Maximum operating current shall be less than 3A
9. Solar Three-way Valve's cable shall be (3 × min 0.5 mm
cable.
10. Must install Solar Connection PCB
Connection PCB's installation instruction for detail of installation.
11. Solar Pump Station's cable shall be (2 × min 0.5 mm
cable. Strongly recommended install with maximum length of 10 meter only.
11.4.1. Wire Stripping And Connecting Requirement
11.4.2. Connecting Requirement
For WH-MXF09D3E5:
• The equipment's power supply 1 complies with IEC/EN 61000-3-12 provided that the short-circuit power S
equal to 817.851kW (for WH-MXF09D3E5) at the interface point between the user's supply and the public system. It is the
responsibility of the installer or user of the equipment to ensure, by consultation with the distribution network operator if
necessary, that the equipment is connected only to a supply with a short-circuit power S
• The equipment's power supply 1 shall be connected to a suitable supply network, having service current capacity ≥100A per
phase. Please liaise with supply authority to ensure that the service current capacity at the interface point is sufficient for the
2
), double insulation layer of PVC-sheathed or polychloroprene sheathed cable. (connection
2
), double insulation layer of PVC-sheathed or polychloroprene sheathed cable.
2
), double insulation layer of PVC-sheathed or polychloroprene sheathed cable.
2
), double insulation layer PVC-sheathed or polychloroprene sheathed
(optional) to Mono bloc unit when Solar Pump Station is utilized. Refer Solar
2
), of double insulation PVC-sheathed or polychloroprene sheathed
Terminal screw
Tightening torque N•cm {kgf•cm}
M4
M5
.
rms
157~196 {16~20}
196~245 {20~25}
39
is greater than or
sc
greater than or equal to 817.851kW.
sc