IBM Power Systems E870 Technical Overview And Introduction page 48

Hide thumbs Also See for Power Systems E870:
Table of Contents

Advertisement

5137ch02.fm
Flexible symmetric multiprocessing (SMP) cables are used to connect system nodes when a
Power E870 or Power E880 is configured with more than one system node. Figure 2-3 on
page 34 shows the SMP connection topology for a two drawer Power E870 or Power E880
system.
Figure 2-3 SMP connection topology for a two-drawer Power E870 or Power E880
34
IBM Power Systems E870 and E880 Technical Overview and Introduction
Draft Document for Review October 14, 2014 10:19 am
X3 X1 X0
X3 X1 X0
X3 X1 X0
P0
P2
A2 A1 A0
A2 A1 A0
A2 A1 A0
T1
T2
T3
T4
T6
T5
T4
T3
A0 A1 A2
A0 A1 A2
A0 A1 A2
P1
P3
X0 X1 X3
X0 X1 X3
X0 X1 X3
Drawer 0
X3 X1 X0
P3
P1
A2 A1 A0
T5
T6
T2
T1
A0 A1 A2
P2
P0
X0 X1 X3
Drawer 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power systems e880

Table of Contents