Lenovo 7387 Hardware Maintenance Manual page 58

Lenovo computer hardware maintenance manual
Hide thumbs Also See for 7387:
Table of Contents

Advertisement

Diagnostic Error Code
011-027-XXX Serial port Configuration/Setup error
011-03X-XXX 011-04X-XXX Serial port failure
011-195-XXX Serial port Test aborted by user
011-196-XXX Serial port test halt, error threshold
exceeded
011-197-XXX Serial port test warning
011-198-XXX Serial port test aborted
011-199-XXX Serial port test failed, cause unknown
011-2XX-XXX Serial port signal failure
014-000-XXX Parallel port Interface Test Passed
014-001-XXX Parallel port Presence
014-002-XXX 014-003-XXX Parallel port Timeout/Parity
error
014-013-XXX 014-014-XXX Parallel port Control
Signal/Loopback test failure
014-015-XXX Parallel port External Loopback failure
014-027-XXX Parallel port Configuration/Setup error
014-03X-XXX 014-04X-XXX Parallel port failure
014-195-XXX Parallel port Test aborted by user
52
Hardware Maintenance Manual Lenovo 3000 J Series
FRU/Action
1. Run Setup, enable port
2. Flash the system. See "Flash update procedures" on
page 185
3. System board
System board
Information only Re-start the test, if necessary
1. Press F3 to review the log file
2. Re-start the test to reset the log file
1. Make sure the component that is called out
is connected and/or enabled. See Chapter 6
"Diagnostics, Test and Recovery Information" on
page 41
2. Re-run test
3. Replace the component that is called out in warning
statement
4. Replace the component under test
1. If a component is called out, make sure it is
connected and/or enabled. See Chapter 6
"Diagnostics, Test and Recovery Information" on
page 41
2. Flash the system and re-test. See "Flash update
procedures" on page 185
3. Go to "Undetermined problems" on page 67
1. Go to "Undetermined problems" on page 67
2. Flash the system and re-test. See "Flash update
procedures" on page 185
3. Replace component under function test
1. External serial device
2. System board
No action
1. Remove external parallel device, if present
2. Run setup, enable port
3. System board
System board
System board
1. Wrap plug
2. System board
1. Run Setup, enable port
2. Flash the system. See "Flash update procedures" on
page 185
3. System board
System board
Information only Re-start the test, if necessary

Advertisement

Table of Contents
loading

Table of Contents