Epson DLQ-3000+ Service Manual page 118

Epson dlq-3000+ 24-pin dot matrix printer
Hide thumbs Also See for DLQ-3000+:
Table of Contents

Advertisement

DLQ-3000+

When installing the timing belt to the CR, make 3 - 10 teeth of the belt appear, as
shown in the figure below.

When installing the upper CR guide shaft, ensure that the upper plain oil pad is
installed between the upper CR guide shaft and the CR.

When installing the parallelism adjust bushing, set it with the groove facing up.
CR Guide Shaft
(Lower CR Guide Shaft)
Figure 3-28. Parallelism Adjust Bushing Installation
3-22
WORK POINT
C R
C R T i m i n g B e l t
Figure 3-27. Timing Belt Installation
Groove
Parallelism Adjust Bushing
3 - 1 0 T e e t h
Installation Hole in the Right Frame
Rev. A

Advertisement

Chapters

Table of Contents
loading

Table of Contents