Installation Sequence; Construct The Fireplace Framing - Superior DRT2033 Installation And Operation Instructions Manual

Direct-vent gas fireplaces drt2000 series, drc2000 series
Table of Contents

Advertisement

Innovative Hearth Products
Superior™ DRT2000 and DRC2000 Direct-Vent Gas Fireplaces

INSTALLATION SEQUENCE

The typical sequence of installation is outlined below; however, each installation is unique and may result in
variations to the steps described.
See the pages referenced in the following steps for detailed instructions.
Framing
1. Construct the Fireplace Framing (Page 15).
2. Prepare the Fireplace Top Spacers (Page 17).
3. Route the Gas Supply Line to the Fireplace (Page 17).
4. Rough in the Electrical Supply, if Needed (Page 18).
5. Install the [Optional] Blower Kit before Installation in the Framing (Page 18).
6. Place the Fireplace in the Framing and Secure (Page 18).
Venting
7. Select a Horizontal or Vertical Vent System (Page 18).
8. Install the Vent Restrictor (if necessary) (Page 19).
9. Install the Vent System (Page 22).
Electrical Connection
10. Complete the Field Wiring (Page 34).
11. Install the [Optional] Blower Kit after Installation in the Framing (Page 36).
Gas Connection
12. Connect the Gas Line (Page 36).
13. Verify Proper Fireplace Operation (Page 37).
Finishing
14. Optional: Install the Firebox Liners (Page 51).
15. Traditional Fireplaces: Install the Logs, Volcanic Stone, and Glowing Embers (Page 52).
16. Contemporary Fireplaces: Install the Glass Media (Page 51).
17. Install the Glass Door (Page 55).
18. Adjust the Air Shutter to Ensure Proper Flame Appearance (Page 38).
19. Install the Hood (Page 40).
20. Reinstall the Included Barrier (Page 40).
21. Install the Finishing Materials (Page 40).
22. Attach the Safety-in-Operation Warning Labels (Page 40).

Construct the Fireplace Framing

1.
1. Frame the fireplace as illustrated in Table 11. For corner framing installations, use Table 12. All framing details
must allow for a minimum clearance to combustible framing members as shown in Table 8.
2. If the fireplace is to be elevated above floor level, a solid continuous platform must be constructed below the fireplace.
NOTE: Headers may be in direct contact with the fireplace top standoff spacers when they are bent up vertically,
maintaining the 3" clearance to the fireplace top, but must not be supported by them or notched to fit around them.
All construction above the fireplace must be self-supporting. DO NOT use the fireplace for structural support.
Installation
900004-00, 04/2014
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Drc2033Drc2035Drt2040Drc2040Drt2045Drc2045 ... Show all

Table of Contents