Pre-Installation Steps; Typical Installation Sequence - Superior BRT40STTMN Installation And Operation Instructions Manual

Brt40st b-vent gas fireplaces
Table of Contents

Advertisement

Innovative Hearth Products
BRT40ST See-Through B-Vent Gas Fireplaces

PRE-INSTALLATION STEPS

Front face assembly
Control Compartment (behind assembly)
Control Compartment Access Panel
Figure 7 - Unit Parts Identification
The appliance is shipped with all gas controls
and components installed and pre-wired.
1. Remove the shipping carton.
2. Remove hood buy pulling away from unit
(see Figure 7).
3. Remove front face assembly and barrier by
lifting approimately 1/2" and pulling away
from unit (see Figure 7).
4. Remove the modesty panel by pulling the
bottom right corner of the modesty panel
out slightly to disengage the snap-fit fea-
ture; lift the modesty panel by the tab on
the panel's right end, pull the right end of
the panel away from the cabinet and then
pull the panel diagonally out of the left side
cabinet panel slots. Remove the modesty
panel carefully, so that none of the wires
become loose or disconnected.
5. Open the latch (located under the firebox
floor) securing the glass enclosure panel.
Remove the panel by tilting it outward at
the bottom and lifting it up. Set the door
aside protecting it from inadvertent damage.
See Figure 24 on Page 21.
6. Remove log set box from firebox. Next,
remove embers, vermiculite and volcanic
stone from control compartment. Handle
logs carefully to prevent breakage.
10

TYPICAL INSTALLATION SEQUENCE

The typical sequence of installation is outlined
Hood
below. However, each installation is unique
and may result in variations to the steps
described.
See the page numbers references in the follow-
ing steps for detailed procedures.
Barrier
Step 1. (Page 11) Construct the appliance
framing. Position the appliance within the
framing and secure with nailing brackets and
floor anchor tabs.
Step 2. (Page 13) Route gas supply line to
appliance location.
Step 3. (Page 13) Install the vent system and
exterior termination.
Step 4. (Page 14) Field Wiring
a. Millivolt Appliances - The operating control
switch is factory installed.
Step 5. (Page 15) Make connection to gas
supply.
EDVST SHOWN
(EDVPF - NO NAILING FLANGES
ON END WITH GLASS PANEL)
Nailing
Flanges
Nailing Flanges
Turn tabs down and secure to the floor with
8d nails or other appropriate fasteners
on all sides of the unit which do not have
viewing glass panels.
Figure 8 - Nailing Flanges
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
Step 6. (Page 16) Install and verify outside
air kit operation.
Step 7. (Page 17) Checkout appliance opera-
tion.
Step 8. (Page 18) Install the log set, vermicu-
lite, volcanic stone and glowing embers.
Step 9. (Page 21) Removing and Installing
glass enclosure panels.
Step 10. (Page 21) Adjust burner primary air
shutter to achieve proper flame appearance.
Step 11. (Page 22) Install front face assembly
with barrier and hoods.
Step 12. (Page 23) Conduct limit switch
spillage test.
Step 13. (Page 24) Attach safety in operation
warnings.
NOTE: Front Face Assembly with
barrier installed must be rein-
stalled prior to operation.
EDVCL SHOWN
(FOR EDVCR VIEW, INTERCHANGE SIDES)
Remove these two screws and
Remove these two screws and
use them when installing
use them when installing
the nailing flanges.
the nailing flanges.
Turn tabs down and secure to the floor with
8d nails or other appropriate fasteners on all sides
of the unit which do not have viewing glass panels.
Installation
900301-00 05/2016

Advertisement

Table of Contents
loading

Table of Contents