MCZ Veld Use And Installation

MCZ Veld Use And Installation

Mcz veld wood burning stove

Advertisement

Quick Links

EN
USE AND INSTALLATION
MANUAL
8901142800
NuTech Renewables Ltd
Unit 11, Warrenpoint
Enterprise Centre
Newry Road, Warrenpoint
Co.Down, BT34 3LA
Tel: + 44 28 417 53031
Email: info@nutechrenewables.com
www.NuTechrenewables.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Veld and is the answer not in the manual?

Questions and answers

Summary of Contents for MCZ Veld

  • Page 1 NuTech Renewables Ltd Unit 11, Warrenpoint Enterprise Centre Newry Road, Warrenpoint Co.Down, BT34 3LA Tel: + 44 28 417 53031 Email: info@nutechrenewables.com www.NuTechrenewables.com USE AND INSTALLATION MANUAL 8901142800...
  • Page 2: Table Of Contents

    Cleaning stainless and matt steel surfaces ................23 6.1.5. Cleaning painted parts ......................24 6.1.6. Cleaning the flue pipe ......................24 6.2. CLEANING UNDER THE RESPONSIBILITY OF SPECIALISED STAFF ............24 6.3. QUICK RESPONSE.........................24 Contents Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 3: Introduction

    Should you misplace or destroy the manual or should it be damaged irreparably, ask your retailer or the Manufacturer for another copy, specifying the product identification data. Introduction Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 4: Warnings And Guarantee Terms

    Avoid having several operational flue ducts in the room, or the proximity of a stair well and make sure that there are no appliances in adjacent Warnings and guarantee terms Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 5: Guarantee Terms

    Damage caused by transport and/or handling are not covered by the guarantee. Reference must be made solely to the manual provided for product installation and use. Warnings and guarantee terms Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 6: Installation Recommendations In Compliance With Uni 10683

    Before positioning the stove, drill the hole for the external air inlet (not in the case of installation with Oyster technology). Installation recommendations in compliance with UNI 10683 Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 7: The Operating Environment

    100 cm from the outermost point of the appliance. Installation recommendations in compliance with UNI 10683 Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 8: Connecting The Combustion Air Inlet Pipe

     be positioned in such a way as to not be obstructed Installation recommendations in compliance with UNI 10683 Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 9 Installation recommendations in compliance with UNI 10683 Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 10: Flue Pipe Connection

    Installation recommendations in compliance with UNI 10683 Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 11: Flue Pipe Examples

    Installation recommendations in compliance with UNI 10683 Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 12: Chimney

    2 metres apart and in all cases the chimney must protrude from the ridge of the roof by at least 1 metre. Installation recommendations in compliance with UNI 10683 Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 13: Dimensions And Technical Specifications

    Chapter 3 USE AND MAINTENANCE MANUAL page 3. DIMENSIONS AND TECHNICAL SPECIFICATIONS 3.1. VELD STOVE 267.5 267,5 Dimensions and technical specifications Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 14: Technical Specifications

    Minimum flue pipe height Notes The stove is an intermittent combustion appliance * These data may vary according to the type of fuel used Dimensions and technical specifications Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 15: Installation And Assembly

    Only reposition the sides onto the stove after it has been positioned in the right place. Figure 3 - Removing the packaging screws (Veld stove) BRACKE Figure 2 - Veld stove ceramic packaging Installation and assembly Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 16: Foot Assembly And Adjustment

    G and with sides H-I. Ceramic top assembly: 1. Rest the cover “L” onto the purpose-provided rubber pads featured on the stove casing. Installation and assembly Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 17 Chapter 4 USE AND MAINTENANCE MANUAL page SPINE PINS Installation and assembly Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 18: Operation

    Remove the stickers from the glass ceramic otherwise the high temperature could melt them and cause irreparable damage to the glass. If this is the case, MCZ will not guarantee the glass. The stove can be positioned either in a corner or up against a wall.
  • Page 19: Using The Stove

    The inlet air is either: PRIMARY AIR: Primary air is introduced at the base of the flame to encourage mostly the stove start-up operation Operation Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 20: Veld Stove Air Control

    This position is used to prolong combustion (for instance, at night, or when you are not at home) so that the stove is set to minimum for auto-combustion, to save on fuel and keep the flame burning. Operation Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 21: First Start-Up

    3 combustion chamber ( ). The stove's running time is approximately 45 minutes. On completion of combustion, reload the stove again. Operation Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 22: Air Diffusion Systems

    For further details, we recommend you read the instructions contained in the kit. Operation Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 23: Maintenance And Cleaning

    Usually these surfaces do not need any special treatment and avoiding cleaning them with abrasive materials is sufficient. For stainless and matt steel surfaces, we recommend you clean these with a paper towel Maintenance and cleaning Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 24: Cleaning Painted Parts

     If you have time, remove the embers and ash using a metal container.  Request urgent assistance from the competent authorities. Maintenance and cleaning Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction prohibited...
  • Page 25 MCZ GROUP S.p.A. Via La Croce 8 33074 Vigonovo di Fontanafredda (PN) – ITALY Telephone: +39 0434/599599 PBX Fax: +39 0434/599598 Internet: www.mcz.it e-mail: mcz@mcz.it 8901142800 Rev 1 12/2011...

Table of Contents