6.Remove electric box assy
Remove the 2 screws fixing the cover of elec-
tric box. Lift to remove the cover. Loosen the
wire and disconnect the terminal. Lift to re-
move the electric box assy.
7.Remove 4-way valve assy
Unscrew the fastening nut of the 4-way Valve
Assy coil and remove the coil. Wrap the 4-
way Valve Assy with wet cotton and unsolder
the 4 weld spots connecting the 4-way Valve
Assy to take it out.(Note: Refrigerant should
be discharged firstly.) Welding process
should be as quickly as possible and keep
wrapping cotton wet all the time. Be sure not
to burn out the lead-out wire of compressor.
8.Remove capillary sub-assy
Unsolder weld point of capillary Sub-assy,
valve and outlet pipe of condensator. Then
remove the capillary Sub-assy. Do not block
the capillary when unsoldering it. (Note: be-
fore unsoldering,discharge refrigerants
completely)
69
Electric box assy
4-way Valve Assy
Capillary Sub-assy
Installation and Maintenance