IBC SL 35-199 Operating Instructions Manual page 14

Modulating
Hide thumbs Also See for SL 35-199:
Table of Contents

Advertisement

WARNING
Condensate can cause
corrosion of metal roofing
components and other
roofing materials. Check
with the builder or roofing
contractor to ensure that
materials will be resistant to
acidic condensate. pH levels
can be as low as 3.0
CAUTION
Vent termination clearances
in this section are
code minimum, or IBC
recommended minimum
requirements, and may
be inadequate for your
installation. Building envelope
details must be examined
carefully, and ingress of
moisture into building
structures is to be avoided.
Serious structural damage
may occur if adequate
precautions and clearances
are not allowed for.
These precautions are to be
observed for neighbouring
structures as well as for the
structure the boiler(s) are
installed in.
1-8
SL 35-199, SL 45-260 MODULATING GAS BOILERS
1.4.5 Rooftop Vent Termination
Rooftop vents must terminate as follows:
The exhaust pipe can terminate in an open vertical orientation without concern
about rain infiltration; rain will drain away through the condensate trap.
If used, the intake air pipe is not typically drained, so it must be terminated
with a down-turned elbow (see Figure 4). The intake pipe does not need to
penetrate the roof at the same elevation as the exhaust (as shown); lower
down the roof is OK.
Optional bird screen may be placed in a termination fitting. Leave unglued,
and hold in place with a short nipple. This permits easy access for cleaning.
For roof top venting of multiple boiler sets, group all intake terminals together
for a common penetration through a custom cap. Alternatively, place in the
closest proximity achievable using commonly available pipe flashing. Similarly
group the exhaust pipes and place the 2 separate groups of pipes at least
3' apart (the closest intake and exhaust pipes shall be 36" - or more - apart).
Use the same 24" (minimum) vertical separation for 2 pipe option. For
alternate group terminations, contact the IBC Factory for written guidance.
DO NOT exhaust vent into a common venting system.
Roof Top Concentric Termination Kits are approved for use with this boiler
model. The installation of the vertical roof top concentric termination
must follow the installation instructions supplied with the venting material
manufacturer. Care must be taken to install the termination kit a minimum
horizontal distance of 10' (305cm) away from any portion of the building and a
minimum of 2' (61cm) above the roof line plus the anticipated snow line.
Figure 4: Rooftop vent terminal configurations
1.4.6 Sidewall Vent Termination
Sidewall direct vent applications shall be vented as follows:
Both the inlet and exhaust terminations should normally be located on the
same plane (side) of the building.
INSTALLATION AND OPERATION INSTRUCTIONS

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl 45-260

Table of Contents