IBC SL 35-199 Operating Instructions Manual page 69

Modulating
Hide thumbs Also See for SL 35-199:
Table of Contents

Advertisement

INSTALLATION & COMMISSIONING REPORT
Boiler Details:
Model Number _____________________ Serial Number ______________________________________________
Date of Installation ______________ Address of installation __________________________________________
_____________________________________________________________________________________________
User contact information _______________________________________________________________________
Installer Information Company ___________________________________________________________________
Address ______________________________________________________________________________________
Phone/Fax/E mail ____________________________________________________________________________
__
Fuel
Natural Gas
Gas Supply Pressure (high fire) _______ Inches w.c. Measured Rate of Input (high fire) ____________ Btu/hr
Installation instructions have been followed and completed (Section 1 of Installation and Operating Instructions).
Check-out procedures have been followed and completed (Section 3 of Installation and Operating Instructions).
Leak testing completed
System Cleaned and Flushed (type of cleaner used) ________________________________________________
System Filled (type/concentration of any glycol/chemicals used) _______________________________________
Air purge completed
Relief Valve correctly installed and piped
Condensate trap filled
Ignition Safety Shutoff test completed. Flame current reading - High fire _______ µA - Low fire _______ µA
Owner advised and instructed in the safe operation and maintenance of the boiler and system.
Information regarding the unit and installation received and left with owner
Combustion Readings:
CO
_____________ %
2
Flue temperature _________ Return water temperature (measure simultaneously with flue temp.) _______________
Installers: send this completed sheet - Fax to 604 877 0295 - or - scan and Email to info@ibcboiler.com, and earn
an extra year's Parts Warranty coverage (User to submit corresponding Installation Record from User Guide).
Commissioning has been completed as listed on this report - Installer Signature _____________________________
Propane
gas piping
Condensate drain clear and free flowing
O
CO ____________ ppm
______________ %
2
venting system
Relief valve "try lever" test performed
Fan and combustion components
Condensate Neutralization? Yes/No

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl 45-260

Table of Contents