Inputting The Inspection Time - JUKI DP2100 Instruction Manual

Hide thumbs Also See for DP2100:
Table of Contents

Advertisement

17-2 Inputting the inspection time

1
2
4) Display the threading diagram.
When threading button
7
maintenance and inspection screen is pressed, the
needle thread threading diagram is displayed.
Observe it when performing threading.
1) Display the information screen (maintenance
personnel level).
When information key
section is pressed in the data input screen for
approximately three seconds, information screen
(maintenance level) is displayed.In case of the
maintenance personnel level, the pictograph
located on the upper left side changes from blue
to orange, and five buttons are displayed.
2) Display the maintenance and inspection
information screen.
Press maintenance and inspection information
screen display button
screen.
*
For the two buttons displayed in the bottom stage
at the time of the maintenance personnel level,
refer to
"23 DInformation screen of the
maintenance personnel
140
7 displayed in the
1 of the switch seat
2 in the information
level".

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents