Installation; Suggested Material Required To Complete An Installation; Site Requirements - Pro-Fab Industries Cozeburn Installation And Operation Instructions Manual

Outdoor hot water wood furnace
Table of Contents

Advertisement

Suggested Material Required to
Complete an Installation
For the installation of a single family residential hookup with
the furnace approximately 50 feet (15.24 m) from the building
to be heated, the following will be required:
a. Cozeburn Outdoor Wood Stove (furnace)
b. Concrete pad for furnace base
c. 150 feet (45.72 m) of supply and return line
d. 50 feet (15.24 m) of underground line insulation
e. Forced air furnace heat exchanger (radiator or coil)
f. Domestic hot water tank heat exchanger (optional)
g. Circulating pump
h. Pipe fittings
i. Two ball valves
j. Approved rust inhibitor
k. Thermostat
l. Installation and Operation Instruction Manual
COZEBURN INSTALLATION AND OPERATION MANUAL

Site Requirements

1. The Cozeburn furnace must be installed on a
noncombustible floor pad, such as concrete or patio
blocks.
2. There must be a minimum clearance between the furnace
and any combustible material as follows:
From top of furnace 60 inches (152 cm)
From front of furnace 48 inches (122 cm)
From side of furnace 6 inches (15 cm)
From rear of furnace 48 inches (122 cm)
From flue pipes 18 inches (46 cm)
3. Install the furnace in a location that best suits wind
direction for your home and building(s) and neighbouring
residents.
Consult with an insurance provider to confirm acceptable
furnace installation distance from all buildings.
4. The Canadian Standards Association requires a minimum
5 feet (1.52 m) of insulated chimney in order to obtain the
best draft in the furnace.
5. Installation of the Cozeburn furnace must be completed in
accordance with local, state, provincial or federal building
and fire codes which may differ from this manual.
IMPORTANT: Contact an insurance provider prior to
installation to ensure that installation is in compliance with
local insurance requirements and all terms have been met.