Installation; Minimum Clearance To Combustibles; Installation Requirements - Pro-Fab Industries Empyre Elite 100 Installation And Operation Instructions Manual

Hot water furnace
Hide thumbs Also See for Empyre Elite 100:
Table of Contents

Advertisement

Identifying main Components
(see drawings on page 8)
no.
description
1
Smoke Curtain
2
Buzzer
3
On/Off Switch
4
Temperature Control
5
Loading Door
6
Ash Clean Out Door with Inner Replaceable Panel
7
Ash Tray
8
Secondary Burn Chamber
9
Heat Exchange Flues
10
Door Lock Bar
11
Latch Catch Bolt
12
Exhaust Exit Lever
13
Lifting Hook
14
Top Panel
15
Switch Trigger
16
Smoke Exit Connector Bar
17
Ash Rake and Brush Hanger
18
Ash Rake
19
Side Panel
20
Overflow
21
Exhaust Area
22
Return Port - Model 100 1" NPT /Model 200 1-1/4" NPT
23
Electric Element Ports
24
Drain
25
Supply Port - Model 100 1" NPT /Model 200 1-1/4" NPT
26
Blower
27
Exhaust Flange - 6" Stove Pipe
28
Vent Cap & Water Level Indicator
29
Timer
30
Limit Switch
31
Flapper Unit
32
Smoke Exit Connector Bar
33
Smoke Exit Lid
34
Flue Cleaning Brush
35
Flue Cleaning Tool
36
Extension Leg (optional - Model 100 only)
37
Leg Brace (optional - Model 100 only)
38
Rear Access Cover
39
Flue Clean Out Cover
40
Probe Port A
41
Low Water Cut Off Port/Probe Port B
42
Snap Disc/Furnace Manual Reset - 190°F (88°C)
EmpyrE ElItE InstallatIOn and OpEratIOn manual
43
Temperature Probe Well
44
Furnace Power Cord
45
Removable Air Pan
46
Air Pan Lock
47
Air Gate
48
Brick Configuration - for detailed drawing see page 26 & 27
49
Refractory Layout - for detailed drawing see page 26 & 27
50
Empyre System Optimizer
Optional: low water cut off switch kit. ask your dealer for details.

minimum Clearance to Combustibles

Side Wall to Furnace
Back Wall to Furnace
Front of Furnace to Combustibles
Flue Pipe
Ceiling to Furnace
Floor

Installation requirements

1. The Empyre Elite must be installed on a level stable
surface, preferably on a concrete floor but may be
installed on a combustible floor provided that a
noncombustible liner (such as sheet metal or masonry)
be placed on the floor, ensuring the following areas
are covered to catch stray embers:
- Underneath the furnace;
- At least 16" (406 mm) in front and 8" (203 mm) on
either side of the fuel loading and ash removal doors;
- Underneath the chimney connector and extending at
least 2" (50 mm) on either side of the chimney connector.
2. Adhere to minimum clearance to combustibles as stated
in this manual and in accordance with local, state,
provincial and federal building and fire codes.
3. Install in a large open area when possible. Minimum
enclosed, not well vented, room size is 100 square
feet (9.3m
).
2
4. Room must be vented to outside air, see page 11.
5. This furnace is designed to work in conjunction with
another heat source. When installing, DO NOT relocate
or bypass any of the safety controls in the original (gas,
oil or electric) boiler installation that is to be used as the
backup system.
ImpOrtant: Contact an insurance provider prior to
installation to ensure that installation is in compliance with
local insurance requirements and all terms have been met.
nOtE: If the Empyre Elite is being installed with a gas
boiler as the backup system, the operation of the gas
boiler must be verified for acceptable operation before
and after installation of the Empyre Elite. This inspection
must be done by a qualified gas fitter who is recognized
by the regulatory authority.

InsTallaTIon

12" (305 mm)
12" (305 mm)
48" (1220 mm)
12" (305 mm)
24" (610 mm)
0" (0 mm)
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Empyre elite 200

Table of Contents