VENT TERMINAL, ROOF INSTALLATION

• Here are the distance requirements for roof terminal installation.
• Clearance between combustible wall and vent pipe must be 2" and a radiation shield must be
use to cross and insulated wall.
• If vent terminal is more then 5 feet above the roof use roof braces to secure the whole
assembly

INSTALLATION OF SIDE PANELS AND PEDESTAL

• Remove the three nuts on each side of the stove.
• Place both panels in position and only screw the nuts back on manually.
• Align the panels with the gold trim and tighten all nuts.