Once the position of the stove and the termination cap are fixed, you should select the venting kit
appropriate for your needs. First floor installations require either a STRAIGHT OUT kit or a
CORNER kit while basement installations must be done with a BASEMENT kit. Please note
that the BASEMENT kit can also be used on first (or higher) floors and it is possible to use up to
25' of pipe with a distant installation.
STRAIGHT OUT INSTALLATION:
1)
- Make a 10-1/2" x 10-1/2" opening in the wall, 23-1/2" inches above the base of the
stove.
- Cut the radiation shield to lenght, if necessary and install as shown. Secure with
four # 10-1 wood screws.
- Install the vent pipe starting from the stove working your way out.
NOTE: All joints must be sealed with RTV silicone, 315°C. (600°F) temperature
resistance.
•
Fix the 5" rigid pipe on the stove with three tek screws and cut to leave a 2-1/2" projection
over the exterior wall.
•
Cut the 8" diameter pipe to be flush with outside face of exterior wall and fix it to the stove
with three tek screews throught the radiation shield.
•
Seal the pipe joints with silicone
•
The installation inside the house is now completed. The next step is to install the vent
termination cap following the instructions in the next section.
CORNER INSTALLATION
2)
- Make a 10-1\2" x10-1\2" opening in the wall 23-1\2" inches above the base of the
stove.
- Cut the radiation shield to lenght, if necessary, and install as shown. Secure with
four (4) #10-1" wood screws.
- Install the vent pipes starting from the stove working your way out.
NOTE: All joints must be sealed with RTV Silicone, 315°C (600°F) temperature
resistance.
•
Fix the 5" flexible pipe on the stove with locking band and seal with silicone cut to leave a 2-
1/2" projection over the exterior wall.
•
Slip on the 45° x 8" elbow.
VENTING KITS
:
12