Installing Pump Tubing - Bunn SLCC-6 Installation & Operating Manual

Table of Contents

Advertisement

1. Loosen the thumbscrews securing the tubing retainer plates to the pump bodies and set the retainer plates
aside.
2. Depress the tension screws and remove them from the notch in the pump body, releasing the spring tension
on the pump bands.
3. Apply lubricant (BUNN-O-Matic part no. M2531.0001) to the middle section of the new pump tubing.
4. Insert the free end of the pump tubes over the outlet fittings in the bottom of the chiller cabinet as far as
possible.
5. Carefully wrap the new tubing around the rotors, making sure that the elbows end up parallel to the rotor
face.
6. Depress the tension screws and insert it in the notch in the pump body, reapplying spring tension on the
pump bands.
7. Replace the tubing retainer plates and tighten the thumbscrews.
8. Open the product containers and insert the stainless steel drawtubes into the containers.
Note: Replacement Tube Kits can be purchased from BUNN-O-MATIC. Order part no. 39329.1000
9. Seat pump tubes into notches on product shelf drip pan as shown.
10. Prime the pumps. Refer to Priming the Concentrate Lines section.

INSTALLING PUMP TUBING

Thumbscrew
Remove Retaining Plate Release Spring Tension
Tension Screw
Tube Clamp
Install New Tubing
2.0"
Tension
Screw
Lubricate between arrows
Lubricate New Tube
Completed Installation
8
2.0"
39328 012607

Advertisement

Table of Contents
loading

Table of Contents