Pre-Installation Checklist - Multiplex S250M 8 Installation, Use & Care Manual

Beverage/ice dispenser with flex manifold
Table of Contents

Advertisement

Installation Instructions

Pre-installation Checklist

When installing any system, first make sure the major components are available. Generally the major components
necessary for an installation are:
B-I-B SYSTEM ALSO:
B-I-B connectors
B-I-B regulator set
B-I-B rack
B-I-B syrup boxes
POST MIX SYSTEM:
CO
regulator set
2
Beverage dispenser
Beverage tubing
CO
tank
2
Carbonator
Stepless (Oetiker) clamps
Chain for CO
tank
2
2-2
BULK SYRUP SYSTEM ALSO:
Syrup connectors for Bulk tank
Gas connectors for Bulk tank
Bulk syrup tanks
DOUBLE CHECK:
Do you have enough space to install the
dispenser or a dispenser and top mounted
cuber?
Does top mounted cuber (if utilized) have a
minimum of 6 inches (15.3 cm) clearance on all
sides?
Is the countertop level?
Can the countertop support the weight of the
dispenser, or the dispenser/cuber combination
plus the weight of the stored ice?
ALSO CONSIDER:
Water line
Drain
Power outlet
Heating and air conditioning ducts
Section 2
Part Number 020002115 10/11

Advertisement

Table of Contents
loading

This manual is also suitable for:

S250m 10

Table of Contents