Installation Instructions

Unit Installation

1. Place the dispenser in the desired location.
2. Run the beverage lines and water lines (make sure
to install the water connections to the proper inlets).
(Refer to plumbing diagrams)
3. Install drain plumbing and insulate.
(See Drainage Options)
4. Set flexible manifold for correct drink settings.
5. Fill bin with ice.
6. Connect power supply.
7. Brix beverage valves.
8. Meet all code requirements.
Installing Baffle for Ice Machine
Installations
"S" SERIES BAFFLE
1. Remove both front panels.
2. Examine the ice machine to see if the machine has
four screws on the lower front plastic panels.
3. If there are screws, remove them from the
countersunk holes on the front surface of the
machine, save the screws.
4. Install the deflector, using the four screws removed
in step three.
5. Four screws and two backing plates are in the kit.
6. If there are no screws on the ice machine (step 2),
pierce the thin plastic countersunk holes, install the
backing plates and install the deflector using the
screws from the kit.
7. Replace the front panels.
"Q" SERIES BAFFLE
1. Position baffle on top of water well with tab on the
front and the other tab inside the water well.
2. Mount the baffle on the left side of the ice maker
using the hole and screw provided.
2-6
Backing Plate
to Be Inserted
Into Side
Pocket of
Bulkhead
Screws
New Ice Baffle
Screws
"S" Series Ice Machine
0.69"
(1.7 cm)
Ref.
6.32"
(16.0 cm)
Ref.
7.22"
(18.3 cm)
Baffle, Manitowoc Ice Maker
Ref.
"Q" Series Ice Machine
Section 2
Backing Plate
to Be Inserted
Into Side
Pocket of
Bulkhead
Part #5007892
Part Number 020002115 10/11

Advertisement

Table of Contents
loading

This manual is also suitable for:

S250m 10

Table of Contents