Table Of Contents - gledhill BoilerMate CP 120 Design, Installation & Servicing Instructions

Boilermate cp series mains pressure hot water thermal store for use with central plant boilers
Table of Contents

Advertisement

Benchmark places responsibilities on both manufacturers and installers. The purpose is to
ensure that customers are provided with the correct equipment for their needs, that it is
installed, commissioned and serviced in accordance with the manufacturers instructions
by competent persons and that it meets the requirements of the appropriate Building
Regulations. The Benchmark Checklist can be used to demonstrate compliance with
Building Regulations and should be provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work in
accordance with the Benchmark Code of Practice which is available from the Heating
and Hot Water Industry Council who manage and promote the Scheme. Visit www.
centralheating.co.uk for more information.
For further information on the HWA Charter Membership, please refer to the HWA website
hotwater.org.uk.
ISSUE 2: SEPTEMBER 2014
Section
INSTALLATION
SERVICING
Annual Service
ADDENDIX
Addendix A
Addendix B
Addendix C
Terms & Conditions
BENCHMARK
Commissioning Checklist
Service Record
The Gledhill BoilerMate CP range is a
WBS listed product and complies with
the HWA Specifi cation for hot water only
thermal storage products. The principle was
developed in conjunction with British Gas.
This product is manufactured under an ISO
9001:2008 Quality System audited by BSI.
Gledhill's fi rst priority is to give a high quality
service to our customers.
Quality is built into every Gledhill product
and we hope you get satisfactory service
from Gledhill.
If not please let us know.
Page 2
Page
3
5
9
13
14
20
21
21
22
23
25
26
27
28
30
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents