Download Print this page
EarthWay EV-N-SPRED C22HD Assembly And Operating Instructions Manual

EarthWay EV-N-SPRED C22HD Assembly And Operating Instructions Manual

Broadcast spreader

Advertisement

Quick Links

P
C
LEASE
ALL IF YOU ARE MISSING ANY PARTS
THE SAFE OPERATION OF THIS SPREADER
S
H
L
: 574-848-7491 or 800-294-0671 E
UPPORT
OT
INE
HELPFUL HINTS:
If your spreader does not spread evenly, be sure the FRONT on the gear box points to the front of the spreader. The impeller must
turn clockwise. Reversing the gearbox will cause the impeller to turn counter clockwise. Clean the impeller after each use as some
fertilizer may become stuck on the impeller blades and will cause uneven spreading.
Your spreader is designed to be pushed at three miles per hour, which is a brisk walking speed. Slower or faster speeds will change
the spread patterns. Wet fertilizer will also change the spread pattern and flow rate. Clean and dry your spreader thoroughly after
each use. Wash between the shut off plate and bottom of the hopper.
Gears are permanently lubricated at the factory. Do not open the gearbox or dirt may enter.
When using Rock Salt remove the agitator to prevent damage to the gearbox and remove salt from the hopper daily. Rock Salt will
reconstitute back into a solid block over night with humidity and will damage your spreader.
1.
Remove and identify all of the loose parts from carton.
,
HAVE ANY DIFFICULTY IN ASSEMBLY
. T
HIS MODEL INCLUDES LIFETIME TECHNICAL SUPPORT
: support@earthway.com
MAIL
2.
Position hopper on side. Install frame using (4) #14x 1-1/2" Flat
Head Phillips machine screws.
ASSEMBLY and OPERATING INSTRUCTIONS
EarthWay
C22HD & C22HDS
Broadcast Spreader
,
OR HAVE ANY QUESTIONS REGARDING
R
S
OCK
FOR USE IN THIS SPREADER
R
EMOVE AGITATOR WHEN USING
®
E
-N-S
V
PRED
ALT IS NOT RECOMMENDED
.
I
M
.
CE
ELT
Pt# 52153
PAGE 1

Advertisement

loading

Summary of Contents for EarthWay EV-N-SPRED C22HD

  • Page 1 ASSEMBLY and OPERATING INSTRUCTIONS EarthWay ® -N-S PRED C22HD & C22HDS Broadcast Spreader LEASE ALL IF YOU ARE MISSING ANY PARTS HAVE ANY DIFFICULTY IN ASSEMBLY OR HAVE ANY QUESTIONS REGARDING THE SAFE OPERATION OF THIS SPREADER HIS MODEL INCLUDES LIFETIME TECHNICAL SUPPORT : 574-848-7491 or 800-294-0671 E : support@earthway.com...
  • Page 2 Install impeller onto pinion shaft. Insert 1/8” x 1-1/4” cotter pin through impeller then through pinion shaft. Use hole nearest gear box. Spread cotter pin to prevent from falling out. Next, install the Cross Brace through the Gearbox Brace as shown above. Install Gearbox by inserting the pinion shaft into hole in center of hoppers bottom.
  • Page 3 Install drive wheel to axle using pin hole nearest to lower handles as shown. Insert 2” cotter pin through wheel and through axle. Bend with pliers to prevent pin from falling out. Install coast wheel to axle using outside pin hole as shown on the left, insert 1”...
  • Page 4 Install handle shaft to lower handles and pivot & bracket assembly as shown. Using (4) 1 ½” bolts and (4) locknuts. [T : Attach right side first, then attach left (Pivot Bracket) side] IGHTEN BOLTS AND NUTS NOW nstall flattened end of control rod in to lever on gauge into Control Rod Tabbed hole as shown.
  • Page 5: Warranty

    (574)848-7491 & 800-294- While pushing spreader forward, pull control lever back to 0671, or email at sales@earthway.com and describe the nature of stop bolt. the defect and we will send repair parts to you. To stop, push lever forward to close flow holes before you Due to the corrosive nature of most fertilizers and ice melters, stop moving.
  • Page 6 Gear Box & Axle Assembly 12273 Handle Grip 12220 Hopper Bushing 12352 New Axle Bearing 60069 Upper Handle Assembly C22HD W/Grip 12278 New Pro Shut-Off Plate *3/16" X 2" Cotter Pin 60070 Upper Handle Assembly C22HDS W/Grip 24215 Lower Handle C22HDS Stainless...

This manual is also suitable for:

Ev-n-spred c22hds