GAYLORD ELXC Series Operation, Maintenance & Installation Manual page 86

Gaylord elxc or elxc-uvi series ventilators
Table of Contents

Advertisement

VENTILATOR START-UP INSPECTION AND TES
Ventilator Start-Up Inspection and Test Report
For Gaylord Model ELXC and ELXC-UVi Series Ventilators
Facility Name __________________________________
Address _______________________________________ __________________________________________
City _______________________ State _____ Zip ______ Gaylord Rep Name __________________________
Facility Contact Name ___________________________
Facility Contact Phone # __________________________ Date of Start-Up ____________________________
Facility E-Mail ___________________________________ Gaylord File Number ________________________
Exhaust Volume Readings
1. Push the START FAN button on the Gaylord Command Center. The exhaust fan should come on. Note;
if the Ventilator includes an electric damper it may take up to 45 seconds for the exhaust to come up
to 100%. Did the exhaust fan come on. .................................................................................. _____ Yes ____
No
2. Determine the exhaust volume for each Ventilator section by either the Static Pressure Method or the
Velocity Method as detailed in the ELXC Series Operation, Maintenance and Installation Manual.
Record all readings in the chart below. Record the Design CFM from the Gaylord Drawings or the
Ventilator Nameplate. If the installation includes a Plenum Box make up air system, take velocity
readings and record on the chart.
Item
Ventilator Description
No.
K-112 Griddle Fryer Line
K-114 Oven Kettle Line
Item
Ventilator Description Length Ventilator Serial #
No.
Make-Up Air
1. When the Exhaust Fan is on the Make-Up Air should be on. Is the Make-Up air on. ... ____ Yes ____ No
2. Type of Make-Up Air discharge.
___ Ceiling Registers located approximately ____ ft. in front of Ventilator.
___ Ceiling Plenum Box located immediately in front of Ventilator. Dimension from bottom of
Ventilator to discharge screen of Plenum Box. ______
___ Ceiling Plenum Box located approximately ____ ft. in front of Ventilator.
___ Linear Diffusers or registers located approximately ____ ft. in front of Ventilator.
___ Other ____________________________________________________________
Ventilator Start-Up Inspection And Tests - cont.
Exhaust Volume Test Chart - Example
Length
Ventilator Serial #
10'-0"
16'-0"
Exhaust Volume Test Chart
Gaylord Representative Company Name
Signature _________________________________
Plenum
Plenum Static
Box FPM
Design
Actual
125
110
0.22
0.28
Plenum
Plenum Static
Box FPM
Design
Actual
B-3
Appendix B, Page B-3
Inlet Velocity
Total CFM
Design
Actual
Design
664
610
1440
2512
Inlet Velocity
Total CFM
Design
Actual
Design
% +
or -
Actual
1325
-8%
3039
21%
% +
or -
Actual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Elxc-uvi series

Table of Contents