Ventilator Start-Up Inspection And Tests - Overview; Pre-Start-Up Checklist - GAYLORD ELXC Series Operation, Maintenance & Installation Manual

Gaylord elxc or elxc-uvi series ventilators
Table of Contents

Advertisement

Overview
As one of the benefits of purchasing a Gaylord ELXC or ELXC-UVi Series Ventilator is a complete Start-Up In-
spection is performed by a Gaylord Authorized Representative or a Gaylord Certified Service Agency. These
tests must be conducted prior to use by the operator. Typically at the time the Start-Up Inspection is per-
formed, the operation and general maintenance of the Gaylord equipment is demonstrated and described
to the operating personnel. It is the responsibility of the Gaylord Authorized Representative or Agency to
coordinate the date of Start-Up with any personnel such as the GC, owner, owner's rep, Fire Marshall, fire
protection contractor, air balancer etc., required to witness the Start-Up.
For the ELXC Series Ventilator (without UV Lamps) the Authorized Representative or Agency uses the form
titled Ventilator Start-Up Inspection Report, as shown on page B-3 of this manual. For ELXC-UVi Series Venti-
lator (with UV Lamps) both forms Ventilator Start Inspection Report and UV Start-Up and Test Report, page
B-4, are used.
The UV Lamp Modules for ELX-UVi Series are shipped by Gaylord Industries directly to the jobsite. A Gaylord
Authorized Representative or Agency will install the modules at the time of Start-Up.
Pre Start-Up Requirements
Before a Gaylord Start-Up can be performed, the responsible contractor or dealer must have the Ventilator
installed and operating. The following is a check list of items that must be completed prior to a Start-Up be-
ing conducted.
Pre Start-Up Check List
____ Ventilator is installed above cooking equipment as per Gaylord Submittal Drawings.
____ The exhaust ductwork is connected to the Ventilator and the exhaust fan.
____ The supply ductwork is connected to the ceiling diffusers and the make-up air fan (system).
____ The exhaust fan is operational and is running in the correct direction.
____ The make-up air system is operational.
____ All required electrical connections between the Gaylord Command Center and the Ventilator, Building
Management Systems, Remote Monitoring Systems, and Fire Extinguishing Systems are completed per
plans, and are operational.
____ Ventilators built in multiple sections are inter-wired.
____ The Ventilator lights are wired and operational.
____ Hot water supply is connected to the Wash Control Cabinet.
Ventilator Start-Up Inspection And Tests
B-1
Appendix B, Page B-1