Grounding The Chassis - Alcatel-Lucent 7210 Installation Manual

Service access switch (sas-x)
Hide thumbs Also See for 7210:
Table of Contents

Advertisement

Grounding the Chassis

Before powering on the switch, ground the switch to earth as described below.
Step 1
Step 2
Step 3
Step 4
Step 5
CAUTION: The earth connection must not be removed unless all supply connections have been
disconnected.
7210 SAS-X Installation Guide
Ensure that the rack on which the switch is to be mounted is properly grounded.
Ensure that you have made a suitable electrical connection to the grounding point on the
rack. Ensure that no paint or isolating surface treatment is present on the grounding point.
Disconnect all power cables to the switch.
The switch chassis is connected internally to 0 V. This circuit is connected to the double-
hole grounding terminal on the rear of the switch (lower right corner) using Metric M4-.7
pitch screws and a Panduit LCCF8-14A-L or compatible ground lug. The surface area
around this terminal is not painted in order to provide for a good connection. Attach a #8
AWG stranded copper wire to the grounding terminal on the switch.
Attach the grounding wire to the ground point on the rack.
Installing the 7210 SAS-X
Page 35

Advertisement

Table of Contents
loading

Table of Contents