Chevrolet Chevelle 1977 Repair Manual page 278

Chevrolet 1977 passenger cars and light duty truck (series 10-30) unit repair manual (overhaul)
Table of Contents

Advertisement

(20017A-42
T.V. EXHAUST V A LV E LIFTER
Fig. 7A-1 6 5 A — I nsta 1 1 i n g T h r o ttle Valve and B ra c k e t A s s e m b ly
O I L SC R EEN
Fig. 7A-1 6 6 A — I n sta 1 1 i ng Oil Screen
4. Install speedometer retainer and attaching bolt, align
slot in speedometer driven gear housing with retainer.
Torque bolt to 8.0-14.0 N -m (6-10 ft. lbs.).
5. Place transmission in cradle or transmission jack.
Remove holding fixture, J-8763-02 from transmission.
Fig. 7A-1 67 A --R e m o vin g and In s ta llin g Sper Driven Gear -
T yp ic a l
OVERHAUL MANUAL
THROTTLE LEVER &
BRACKET ASSEMBLY
THROTTLE LEVER
T O
CABLE LIN K
O" RING SEAL!
SPEEDOMETER DRIVEN
GEAR ASSEMBLY
Fig. 7A-1 68A --R e m o vin g Pump Cover Bu shin g - Front
BUSHING REPLACEMENT
PUMP COVER BUSHINGS
Front Bushing
1. Using tool J-24036 with Slide Hammer, J-7004-1,
remove bushing (Fig. 7A-168A).
2. Using tool J-25019-2 with D river Handle J-8092,
drive or press new bushing into place until tool bottoms
(Fig. 7A-169A).
Rear Bushing
1. Using tool J-25019-14 with Slide Hamm er J-7004-1,
remove bushing (Fig. 7A-170A).
2. Using tool J-25019-6 with Driver Handle J-8092,
drive or press new bushing until tool bottoms (Fig. 7A-
171 A).
PUMP BODY BUSHING
1. Place pum p body with the m achined face down, on
two blocks of wood, to prevent damaging the machined
surface.
2. Using tool J-25019-4 with Drive H andle J-8092,
remove bushing (Fig. 7A-172A).
3. Using tool J-25019-12 with D river Handle J-8092,
drive or press new bushing into place until tool bottoms
(Fig. 7A-173A).
Fig. 7A-1 6 9 A — I nsta 1 1 i ng Pum p Cove r Bu sh in g - Fro nt
PU MP
C O V E R

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents