Shroud; Electrical Parts; Overload Protector; Compressor - Friedrich ZQ08C10 Service And Parts Manual

115 volts room air conditioner
Table of Contents

Advertisement

2.2.3 SHROUD

1. Remove the fan. (Refer to section 2.2.2)
2. Remove the shroud. (See Figure 8)
3. Re-install the components by referring to the
removal procedure, above.

2.3 ELECTRICAL PARTS

2.3.1 OVERLOAD PROTECTOR

1. Remove the cabinet. (Refer to section 2.1.2)
2. Remove the nut which fastens the terminal cover.
3. Remove the terminal cover. (See Figure 9)
4. Remove all the leads from the overload protector.
5. Remove the overload protector.
6. Re-install the components by referring to the
removal procedure, above.

2.3.2 COMPRESSOR

1. Remove the cabinet. (Refer to section 2.1.2)
2. Discharge the refrigerant system using a Freon
Recovery System.
If there is no valve to attach the recovery system to,
install one (such as a WATCO A-1) before venting
the Freon
TM
. Remove the valve when finished
3. Remove the overload protector. (Refer to section
2.3.1)
4. After purging the unit completely, unbraze the
suction and discharge tubes at the compressor
connections.
5. Remove the 3 nuts and the 3 washers which
fasten the compressor.
6. Remove the compressor. (See Figure 10)
7. Re-install the components by referring to the
removal procedure, above.
Figure 8
Figure 9
TM
Figure 10
—8—

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cp10c10Zq10c10Cp12c10Cp08c10

Table of Contents