Preparing The Opening - GE JDP40 Owner's Manual

Self cleaning radiant ranges
Table of Contents

Advertisement

Installation Instructions.
Read these instructions completely and carefully.

Preparing the Opening

NOTES:
• Installation of a listed microwave oven or cooking appliance
over the cooktop shall conform to the installation
instructions packed with that appliance.
COUNTERTOP CUTOUT TOP VIEW
Inside back wall of
cabinet or rear wall
Adjoining
vertical
cabinet or
wall above
countertop
3-3/8" Min.
(both sides)
**NOTE: 24" minimum clearance between the
cooktop and the bottom of the cabinet when the
bottom of wood or metal cabinet is protected by
not less than 1/4" flame retardant millboard
covered with not less than No. 28 MSG sheet metal,
0.015" stainless steel, 0.024" aluminum, or 0.020"
copper.
30" minimum clearance when the cabinet is
22
unprotected.
No obstructions on
underside of countertop
in this area
1-1/2" Min.
5/16" Min. Flat
7"
11"
22-7/8"
29" Exact
1-1/8"
Smooth Cut
• To eliminate the hazard of reaching over heated
surface units, cabinet storage space located
above the surface units should be avoided. If
cabinet storage is to be provided, the hazard can
be reduced by installing a range hood that
projects horizontally a minimum of 5" beyond the
bottom front edge of the cabinets.
NOTE: Two sets of holes are provided under
anti-tip bracket. Bracket is attached in the
upper hole position at the factory.
Front
Face of
Cabinet
Overhang
When replacing an existing GE family drop-in
range, the new range and existing cutout may be
installed with the supplied end cap filler blocks
and the lower filler trim panel.
Do not pinch the power supply cord between the
range and the wall.
Do not seal the range to the side cabinets.
ANTI-TIP BRACKET
AT REAR OF RANGE
23-1/2"
26"
30"
20"
1-1/2"
29-3/8"

Advertisement

Table of Contents
loading

Table of Contents