After elaborating the passage of the parcel, the Master scanner again shows the
status of each node (of each scanner of the cluster) and then the Continue or Stop
screen.
6. Repeat steps 3 - 5 changing the PCT-8000 X position (i.e. always before the PS Line
(reference point) and parallel to a conveyor edge but changing to the left-hand edge
and/or to the center of the conveyor), until the procedure terminates.
Typically 3 passes are necessary.
10
Figure 2 - PCT-8000 First Run
Figure 3 - PCT-8000 Second and Third Runs