6.5 Water fill system
The solenoid valves are powered by the
PCB via two or three triacs. The status of
the pressure switch (empty/full) is
detected by two "sensing" lines".
1.
PCB
2.
Anti-boiling level
3.
1st level
4.
Pre-wash solenoid
5. Wash solenoid
6. Bleach solenoid (some models)
7. Heating element
AB_S Anti-boiling level sensor
L1_S
1st level sensor
6.5.1
Calculation of flow rate
Calculation of the capacity – necessary to determine the time for the supplementary fill – is performed by
measuring the time that elapses between the closure of the anti-boiling contact on FULL and the closure of
the 1st level contact.
Volume
Flow rate =
Time (T1-T2)
•
Water fill diagram
ELT = solenoid valve
P1 = 1st level
AB = anti-boiling level
rpm = drum rotation speed
Water in = water fill
Phase A:
The phase during which the initial fill takes place:
1. Water fill until the anti-boiling pressure switch closes on FULL.
2. Water fill until the 1st level pressure switch closes on FULL: the delivery of the solenoid is
calculated during this phase.
3. Water fill for time Q, which varies according to delivery and cycle phase.
Phase B:
If the 1st level pressure switch returns to EMPTY, a supplementary fill is performed until the
pressure switch returns to close on FULL. This phase may be followed by a further timer-
controlled fill.
SOI/DT 2006-11 dmm
Volume = Volume of the tub between the two levels (anti-boiling and
1st level)
T1 –T2 = The time that elapses between the closure of the anti-boiling
and 1st level contacts on FULL
20/39
599 38 47 87