Miele H 6460 BP Operating And Installation Instructions page 114

Hide thumbs Also See for H 6460 BP:
Table of Contents

Advertisement

Cleaning and care
At the end of the activation phase the
steam injection system will need to be
cleaned to remove all traces of
descaling solution.
Cleaning is carried out by flushing
approx. 1 litre of fresh tap water
through the system. The water is
collected in the universal tray. This
process is repeated three times.
A message will appear in the display
with advice about the rinsing process.
N Take the universal tray out of the
oven and empty it. Place the tray
back in the oven again on the top
shelf level.
O Detach the plastic tube from the
container.
P Rinse the container and fill with
approx. 1 litre of fresh tap water.
Q Place the container back in the oven,
insert the plastic tube, secure it to
the container and close the door.
R Touch the OK sensor.
114
The intake process for the first rinse
starts.
Water will be flushed through the steam
injection system and will then collect in
the universal tray.
A message will appear in the display
with advice about the second rinsing
process.
S Take the universal tray out of the
oven and empty it. Place the tray
back in the oven again on the top
shelf level.
T Remove the plastic tube from the
container. Rinse the container and fill
it with approx. 1 litre fresh tap water.
U Place the container back in the oven,
insert the plastic tube, secure it to
the container and close the door.
V Touch the OK sensor.
W Do the same for the third rinsing
process.
Leave the universal tray (with the
water which has collected in it during
the third rinsing process) on the top
oven shelf whilst the evaporation
process takes place.
X Remove the container and tube from
the oven.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H6460bp

Table of Contents