Outdoor Unit; Removal Of External Casing - Daikin FLKS25BVMB Service Manual

Inverter pair floor / ceiling suspended dual type b-series
Hide thumbs Also See for FLKS25BVMB:
Table of Contents

Advertisement

Outdoor Unit

2. Outdoor Unit

2.1

Removal of External Casing

Procedure
Step
1
The stop valve cover
can be removed when
the fixed screw is
removed.
130
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Stop valve
cover
Hook
(R1450)
As three hooks are provided,
slide the cover downward to
remove.
The forced cooling operation
in the pumping down mode
can be carried out by
pushing the operation switch
on the main unit for five
seconds. (The existing
models can do it through the
switch on the PC board just
as well.)
The layout of the connection
ports for the flares has been
changed to horizontal
position from vertical
position.
Stop valve
(liquid)
Stop valve (gas)
(R1451)
SiBE05-311
Points
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents