Putting Into Operation - Wacker Neuson BTS Series Operator's Manual

Gasoline portable cut-off saw
Table of Contents

Advertisement

Putting into operation

7.
Putting into operation
T00962GB
30
ATTENTION:
Always turn off the engine and pull off the spark plug
cap before doing any work on the cut-off saw! Always
wear protective gloves!
ATTENTIONE:
Start the cut-off saw only after complete assembly and
inspection.
For the the following work, use the assembly tools included with
delivery:
1
31
Place the cut-off saw on a stable surface and carry out the following
assembly steps:
2
3
36
1.13/19 AF universal wrench
2. Allen key
3. Carburetor adjustment
screwdriver

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts 1030l3Bts 1035l3Bts 930l3Bts 935l3

Table of Contents