Equipment Checklist; Package Contents; Optional Rack-Mounting Equipment - Edge-Core ES4512C Installation Manual

12/24/48-port gigabit intelligent switch
Table of Contents

Advertisement

3
Installing the Switch

Equipment Checklist

After unpacking the switch, check the contents to be sure you have received all the
components. Then, before beginning the installation, be sure you have all other
necessary installation equipment.

Package Contents

• Gigabit Ethernet Switch (12-port ES4512C, 24-port ES4524C or 48-port
ES4548C)
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and four screws for attaching the
brackets to the switch
• Power Cord
• RS-232 console cable
• This Installation Guide
• User Manual CD (Includes Management Guide)

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following equipment
available:
• Four mounting screws for each device you plan to install in a rack—these are not
included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
3-2
RJ-45 Connector
Figure 3-1. RJ-45 Connections

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es4548cEs4524c

Table of Contents