General Notes To Installer - Carrier 53KHET 30-36 Installation Manual

53khet 30-36 series cool only, 53qhet 30-36 & 53qhe36 series heat pump, hi wall split air conditioners 220-240v ~ 50hz 1ph
Table of Contents

Advertisement

1. GENERAL NOTES TO INSTALLER

Split room air conditioner has been carefully designed and manufactured under strict Quality Control
conditions.
Therefore you are completely responsible for proper installation completion and operation of the
air conditioner.
Carefully read the manual carefully before proceeding with the installation to ensure correct
installation. This manual describes installation instructions to help ensure trouble free operation
and extended life of the air conditioner.
Make sure all accessory parts are with the system before beginning installation.
You will need the following tools for installation:
1. Standard screwdriver
2. Phillips head screw driver
3. Electric drill, Hole core drill
4. Measure tape
5. Water level gauge
6. Pipe clamp
7. Pipe cutter
8. Spanner ( half union )
9. Reamer
After completion of installation, perform a run test and give the customer full
instructions on the correct operation of the air conditioner including:
• Turning the unit on and off.
• Functions of the remote control.
Leave the owner manual with the customer so that it can to be used during operation of the air
conditioner.
Leave the installation manual with the customer so that it can be used for any service and
maintenance operations.
Advise the customer to the tips of energy saving while operating the air conditioner as
mentioned in the owner's manual.
10. Flaring tool set
11. Pipe bender
12. Hexagonal wrench ( 4mm )
13. Torque wrench
14. Vacuum pump
15. Gas leak detector
16. Gauge manifold
17. Thermometer
18. Electrical millimeter
19. Measuring tape
• Removal and cleaning of the air filters.
• Re-installation of air filters after cleaning
1

Advertisement

Table of Contents
loading

Table of Contents