Table Of Contents - Bunn Dual Operating & Service Manual

Hide thumbs Also See for Dual:
Table of Contents

Advertisement

SERVICE
This section provides procedures for testing and
replacing various major components used in this
brewer should service become necessary. Refer to
Troubleshooting for assistance in determining the
cause of any problem.
WARNING - Inspection, testing, and repair of electri-
cal equipment should be performed only by qualified
service personnel. The brewer should be unplugged
when servicing, except when electrical tests are re-
quired and the test procedure specifically states to
plug in the brewer.
COMPONENT ACCESS
WARNING - Unplug the brewer before the removal of
any panel or the replacement of any component.
All components are accessible by the removal of
the top cover, front inspection panel and warmer base
plate.
ga
l
1
1⁄2
l
1 ga
ga
l
1⁄2
D Y
R EA
D ER
G R
IN
R
I
R
G
C TO
H
LE
T
SE
L
E
M ER
F
T
AR
/ W
O N
T
AR
ST
ga
l
1
1⁄2
l
1 ga
ga
l
1⁄2
ER
AT
T W
HO
T
AR
IO
N
ST
UT
CA
!
M ER
/ W
AR
O N
R
C TO
LE
SE
D Y
R EA
N
NT
ER
U T
IO
CA
D DE
C A
AR
DI SC
!
IF :
KE
D
D
AC
HE
PT
Y
. CR
RA
TC
D DR
Y
EM
E
. SC
WH
EN
H FL
AM
IC
. BO
ILE
ED
EC
TR
AT
ON
HIG
D EL
. HE
ED
SE
. US
EX
PO
RY
. OR
EN
S IN
TS
JU
ON
TS
EM
ATI
EN
EL
SK
RP
OR
CO
NT
Y RI
TIC
CO
EL
T
M PL
-O-
MA
NN
E HO
CO
NN
FU
AR
E TO
198
5 BU
IL UR
FA
PN
: 658
P772
The top cover is attached with four #4-40 slotted
head screws.
The front inspection panel is attached with five #6-
32 slotted head screws.
The warmer base is attached with four #6-32
slotted head screws.
Brewer Selector Switch......................................... 16
Bypass Valve ........................................................ 15
Contactor Assembly.............................................. 18
Control Thermostat ............................................... 20
Dispense Valve ..................................................... 22
Electronic Control .................................... 23 thru 28
Grinder Selector Switch ........................................ 28
Level Control Board and Level Probe .................... 29
Limit Thermostat .................................................. 31
ON/OFF Switch (Warmer) ..................................... 32
Overflow Protection Switch .................................. 33
Relay .................................................................... 34
Solenoid ............................................................... 36
Start Switches (Brew) ........................................... 37
Tank Heaters ......................................................... 38
Timers (Early Models) .......................................... 39
Digital Timer (Late Models) .................................. 42
Warmer Elements ................................................. 44
Wiring Diagrams ................................................... 45
Page 14
Contents
27040 011904

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dual dual010000

Table of Contents