Table Of Contents; Contents - Bunn VPR-VPSSERIES Service & Repair Manual

Vpr-vps series bunn
Table of Contents

Advertisement

INTRODUCTION
This equipment will brew a half-gallon batch of coffee into an awaiting dispenser. It can be
easily configured for 120V 15 amp, 120/208V 20 amp or 120/240V 20 amp. The brewer may have
a hot water faucet for allied beverage use. It is only for indoor use on a sturdy counter or shelf.

CONTENTS

Warranty ......................................................................................................... 2
Contents .......................................................................................................... 3
Troubleshooting .............................................................................................. 4
Component Access ......................................................................................... 7
Control Thermostat ......................................................................................... 8
Limit Thermostat (VPR - VPS) ...................................................................... 10
ON/OFF Switch (Warmers) ............................................................................ 11
Tank Heater .................................................................................................. 12
Thermal Cut-Off (VPRA - VPSA) ................................................................... 13
Warmer Elements.......................................................................................... 14
Wiring Diagrams ........................................................................................... 15
Page 3
41667 102708

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vpr seriesVps series

Table of Contents