Chapter 1 Installing OS
1.4
Enabling FC card
The following procedure shows when installing or reinstalling ESXi to the external storage.
Turn on the display and the peripheral equipment connected to the NEC Express5800/ft series.
1.
Remove the front bezel.
2.
Press the POWER switch that is located on the front side of the server.
3.
Lift the acrylic cover, and press the POWER switch.
Important
After a while, the "NEC" logo will appear on the screen.
20
If the power cords are connected to a power controller like a UPS, make sure that it is
Note
powered on.
Do not turn off the power before the "NEC"
logo appears.
While the "NEC" logo is displayed on the screen, NEC Express5800/ft series performs a
Tips
power-on self test (POST) to check itself. For details, refer to Chapter 3 (1.1 POST Check)
in User's Guide.
If the server finds errors during POST, it will interrupt POST and display the error message.
Note
Refer to Chapter 1 (6.2 POST Error Messag) in Maintenance Guide.
Express5800/R320c-E4, R320c-M4 Installation Guide (VMware)
Acrylic cover
POWER switch
1. Setup Procedure