Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 7
Before making a hole in the chimney the fireplace should be
test-mounted in order to correctly mark the position of the
fireplace and the hole in the chimney. See fig. 1 for minimum
dimensions.
Ensure that the flue pipe is inclined all the way up to the
chimney.
Use a flue pipe bend with a sweeping hatch that allows it
to be swept.
Be aware of the fact that it is particularly important that
connections have a certain flexibility in order to prevent
movement in the installation leading to cracks. N.B. A correct and
sealed connection is very important for the proper functioning
of the product.
Recommended chimney draught: «See 2.0 Technical data». If the
draught is too strong you can install and operate a flue damper
to control the draught.
3.5 Assembly prior to installation
Note! Check that the stove is free of any damage prior to
commencing installation.
The product is heavy! Make sure you have assistance when
erecting and installing it.
The product is delivered in one package. A loose handle for the
door is also included. The oval top plate is fastened with screws
during transport.
A heat shield for the floor shall always be used.
A heat shield for the back can be ordered and mounted depending
on the position of the fireplace and the desired distance to
combustible materials. See fig. 1.
1.
Remove the screws from underneath the top plate and leave
it unattached. This makes it easier for the chimney sweep
when the product and the flue pipe have to be cleaned.
2.
Take out the ash lips, which are inside the burn chamber, and
install. The one in front is placed loosely on top of the base
plate, while the side ash
is attached to the base plate.
3.
Fasten the heat shield under the middle using 2 M6 x 12
screws, see fig. 5.
Note! The side load door must not be used in corner installations.
Mounting of flue pipe
See fig. 1 for measures to wall made of flammable materials. The
stove is installed with a 150 mm diameter flue pipe. This must be
an approved thickness.
The flue outlet for Jøtul F 600 is inside the burn chamber during
transportation. You can choose between a top or rear outlet from
the flue pipe. The screws for fastening are in the bag containing
screws.
1.
Flue pipes 150 mm dia. are placed directly onto the product
flue outlet. There is a screw on both sides of the product flue
outlet (fig. 3A). These are used to fasten the flue pipe.
2.
Mark where the screws hit the flue pipe when it is at the
very bottom of the flue outlet and drill a 5,5 mm hole for the
screw in the flue pipe.
3.
Use gasket to seal between flue pipe and product flue outlet.
Place the gasket around the lower part of the flue pipe and
fill up the space with cement.
4.
Fasten the flue pipe with screws.
Note! It is important that the joints are completely sealed. Air
leakage etc. may lead to malfunction.
lip is fastened with the screw that
3.6 Control of functions (fig. 2)
When the product is set up, always check the control functions.
These shall move easily and function satisfactorily.
Air vent (A)
Left position
=
Right position
=
Doorhandle (B)
Towards the left
=
Towards the right =
Doorhandle (C)
Towards the right =
Towards the left
=
Ash door (E)
Open the door by turning the handle counter-clockwise one
half rotation. Use a glove or similar and pull out the tray.

3.7 Ash removal

Jøtul F 600 has an ash pan which makes it easy to remove the
ash.
Scrape the ash through the grate in the base plate and into
the ash pan. Use something like a glove to grab the handle
on the ash pan and take away the ash.
Make sure that the ash pan doesn't fill up so high that it keeps
ash from coming through the grate into the pan.
Make sure the door to the ash pan is securely shut when the
stove is in use.
For the rest, see description of how to handle ash in the Manual
on general use and maintenance in Point «6.1 Fire preventive
measures» in the General use and maintenance instructions
manual.
ENGLISH
closed.
fully open
open
closed
open
closed
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents